As part of the Kelley District Utility Plant project, the chilled water cooling system will be temporarily shut down in Kelley Engineering Center and Johnson Hall on Thursday, July 6 from 5 A.M. to 1 P.M to allow for piping work. The chilled water system controls the air conditioning in the impacted buildings.

The buildings will experience higher than normal temperatures, but the server rooms will not be impacted by this shutdown. ADA access will be maintained during this project.

Other possible impacts include noise and dust near the work site.

For questions or comments on this closure, contact Construction Manager Justin Fuszek (541) 740-5260.

As part of the 2023 Street Safety Project, SW Campus Way between SW 14th St. and SW Pioneer Place will be closed on Thursday, July 6 from 7 A.M. to 1 P.M., except to allow traffic to exit eastbound from Pioneer Place. Workers in the area will be directing traffic, moving equipment and allowing drivers to exit from Pioneer Place as necessary. The westbound lane from 14th St to Pioneer Place will be closed to all traffic.  Vehicles needing access to Pioneer Place may detour around the work area via SW Jefferson Way and enter from the eastbound lane on Campus Way. Please see detour map for reference.

In addition, the dedicated parking spaces for the School of Civil and Construction Engineering will be closed for the duration of the project.

Sidewalks will remain open for pedestrians. Other possible impacts include noise, dust and mud near the construction site.

The map shows a road closure on SW Campus Way between SW 14th St. and SW Pioneer Place.
The map shows a detour route starting at the intersection of SW 14th St. and SW Campus Way. The detour runs south along 14th St. to SW Jefferson Way, west to SW 26th St., north to Campus Way and then east to Pioneer Place. A road closure is marked on Campus Way between 14th St. and Pioneer Place.

For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.

As part of the Summer 2023 Parking Lot Renewal Project, two parking lots on SW Campus Way will be closed this week.

The National Forage Seed Center parking lot will be closed on Wednesday, July 5 & Thursday, July 6.

The Crop Science Building West parking lot will be closed from Wednesday, July 5 – Friday, July 7.

The map shows an aerial view of SW Campus Way between SW 30th and SW 35th Streets with the Crop Science Building West parking lot and the National Forage Seed Center parking lot highlighted.

For questions or comments on this closure, contact Transportation Services at (541) 737-2583.  

As part of the Completing Reser Stadium project, a section of SW Ralph Miller Lane, located directly in front of the P. Wayne Valley Sports Performance Center, will be closed on Wednesday, July 5 from 7 A.M. to 5 P.M for crane activity.

The south sidewalk within the impacted section of Ralph Miller Lane will also be closed. The north sidewalk will remain open.  

The map shows a road and sidewalk closure on SW Ralph Miller Lane, directly in front of the P. Wayne Valley Sports Performance Center. The south sidewalk in the impacted section of Ralph Miller Lane is also marked as closed.

For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.