As part of the Beth Ray Solar project, SW Stadium Ave. will be closed on the south side of the Beth Ray Center on Friday, February 9 from 6:00 – 7:30 A.M. to allow for crane activity. The road closure will be located between the Beth Ray Center and CH2M HILL Alumni Center.

The sidewalks on both sides of Stadium Ave. will also be closed along with two reserved parking spots, the loading dock and the dumpster access area on the south side of the street.

The map shows a road closure on SW Stadium Ave. between the Beth Ray Center and CH2M HILL Alumni Center. The sidewalks on both sides of Stadium Ave. are marked as closed along with two reserved parking spaces, the loading dock and the dumpster access area on the south side of the street.

For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.

As part of the Beth Ray Center Solar project, there will be road, sidewalk and crosswalk closures due to crane activity on SW Stadium Ave. and the alley behind the Beth Ray Center.

This closure will occur in two phases on Monday, February 5.

The first closure is scheduled from 6:00 – 7:00 A.M. This closure will impact the alley behind the Beth Ray Center. Flaggers will be present to direct vehicle traffic through the area. Access to the 26th St. parking garage will be maintained. The crosswalk between the Beth Ray Center and Arnold Dining Hall will be closed along with the sidewalk east of the Beth Ray Center

The second closure is scheduled from 7:00 – 8:00 A.M. This closure will impact SW Stadium Ave. on the south side of the Beth Ray Center. The road will be closed, along with a section of sidewalk on both sides of Stadium Ave. The reserved parking spots, the dumpster access area and the loading dock on the south side of Stadium Ave. will also be closed during this time.

The map shows road, crosswalk and sidewalk closures on SW Stadium Ave. and the alley behind the Beth Ray Center. The first closure marks the location of a crane in the alley. The crosswalk between the 26th St. parking garage and Arnold Dining Hall is marked as closed along with the sidewalk east of the Beth Ray Center. The second closure is marked on SW Stadium Ave., south of the Beth Ray Center. The sidewalk is marked as closed on both sides of the street along with the reserved parking spots, the dumpster area and the loading dock on the south side of Stadium Ave.

For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.