Scheduled: Annual Fire Rollup Door Testing

Effective Date(s):  December 18-20, 2023

An outside contractor will be performing testing on fire rollup doors December 18th-20th .  The testing is approximately ½ hour per door. The door will be closed for that time, and there may be some noise as the door closes and opens. Please see the list of impacted buildings below.

  • Kelley Engineering Center
  • Pharmacy Building
  • Magruder Hall
  • Research Way Building
  • Burt Hall
  • Environmental Health & Safety Annex
  • Austin Hall
  • George W. Peavy Forest Science Center
  • The Valley Library
  • Joyce Collin Furman Hall
  • Gill Coliseum
  • Sports Performance
  • Reser Stadium

For questions or comments on this closure, contact Alarm Shop at 541-737-2969.

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

December 18th

  • Milne Computer Center (device testing only)
  • The Valley Library (elevator only)
  • Covell/Batcheller Hall (sound & sprinkler testing)

December 19th

  • Valley Football Center (Device testing)
  • Reser Stadium (Device testing)

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): August 7th-August 11th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

August 7th

  • Dryden Hall
  • Peavey Forest Science Center
  • Richardson Hall 

August 8th

  • Energy Center
  • Heckert Lodge
  • Reed Lodge

August 9th

  • Kearney Hall
  • Merryfield Hall          
  • Owen Hall

August 10th

  • Reser Stadium East
  • Valley Football Center

August 11th

  • Gill Coliseum
  • Sports Performance Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

For work related to the Completing Reser Stadium project, outside air for multiple buildings including the Valley Football Center, Merritt Truax Indoor Center, and Magruder Hall, will be shut down from 7:30-8:30 a.m. on Friday, January 7, 2022 during the planned implosion of the stadium’s west side.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.