Due to contractor tree work being performed on the north side of the Memorial Union Quad the red marked sidewalks will be closed for access (see map) beginning Wednesday, April 15, 2026 from 8:00 am to 5:00 pm. The green line on the map indicates adjusted path of travel. There will be intermittent loud noise to chip brush.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
Due to contractor tree work being performed on the north side of the Memorial Union Quad the red marked sidewalks will be closed for access (see map) beginning Monday, April 13, 2026 from 8:00 am to 5:00 pm. The green line on the map indicates adjusted path of travel. There will be intermittent loud noise to chip brush.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
Due to contractor tree work being performed on the north side of the Memorial Union Quad the red marked sidewalks will be closed for access (see map) beginning Tuesday, April 14, 2026 from 8:00 am to 5:00 pm. The green line on the map indicates adjusted path of travel. There will be intermittent loud noise to chip brush.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
Due to construction work happening in the area, parking spaces in lots along SW 13th St., between SW Washington Ave. and the railroad tracks will be closed. The impacted lots are Washington Ave. SW (#3201) and Washington Ave. SE (#3209). The parking spaces will be closed through Friday, June 12.
For questions or comments on this closure, contact Project Manager Derek Bennett at (541) 609-6111.
On Friday, March 27, 2026 from 7:00 am – 1:00 pm, the parking lot (#3330) at Wiegand Hall (view map) will be closed to accommodate the crane for removal and reinstallation of new HVAC equipment onto the roof.
For questions or comments on this closure, contact Justin Fuszek at 541-737-1296.
The sidewalk on the south side of Gilkey Hall, between Strand Agricultural Hall and Gilkey Hall, will be closed starting Monday, March 23 – Thursday, March 26. A vacuum truck will be working to excavate the area. Building occupants and those in the surrounding area may notice an increase in construction-related noise during this time frame.
For questions or comments on this closure, contact Project Manager Judd Mentzer.
This notification is for the final stages of a waterline replacement project managed by the city of Corvallis. Please see details for each day below.
Contractors with the city of Corvallis will be establishing work zones along SW 35th St. and SW Western Blvd. during the week of OSU spring break, March 23 – March 27. Workers will be grinding down the existing asphalt and temporary patches before completing the final paving and restriping. Work is planned to begin by 6:00 am and could run as late as 9:00 pm each day.
The closures will occur in phases as follows:
Monday, 3/23
35th Street – Closed to thru traffic between Washington Way and Western Blvd. Local access only for residents and OSU employees. Open at end of the work day.
Western Blvd. – Grinding planned at SW 35th/Western intersection. Open to traffic. The traffic signal at 35th/Western will be turned off around noon and traffic will be controlled by flaggers.
Washington Way – Closed to traffic between SW 30th and SW 35th St. Open at end of the work day.
OSU Western Building and UHDS – SW 35th St. access from the south only.
The Retreat – SW 35th Street access from Deon Dr. only.
City buses – No impacts
Beaver Bus – SW 35th St. stop will be open. Buses will be on detour routes.
Tuesday, 3/24
35th Street – Closed to thru traffic between RR tracks and Western Blvd. Local access only for residents and OSU employees. Open at end of the work day.
Western Blvd. – Open
Washington Way – Open. Limited to right turn only from Washington Way onto SW 35th St. through the end of the work day.
OSU Western Building – SW 35th St. access from the south only. South parking lot entrance will be open. North entrance will be closed during paving.
OSU UHDS – SW 35th St. access will transition from south only to north only as paving progresses. Timing of this change will be communicated with you by city inspector.
The Retreat – SW 35th St. access from Deon Dr. only.
Beaver Bus – SW35th St. and President’s House stops will be closed.
City buses – No impacts
Wednesday, 3/25
35th Street – Closed to thru traffic between Sage brush Dr. and Western Blvd. Local access only to residents, OSU Western Building, and Sagebrush Dr. Open at end of the work day.
Western Blvd. – Open to traffic. The traffic signal at 35th/Western will be turned off and traffic will be controlled by flaggers.
Washington Way – Open. Limited to right turn only from Washington Way onto SW 35th St. through the end of the work day.
OSU Western Building – SW 35th St. access from the north only. North parking lot entrance will be open. South entrance will be closed during paving.
OSU UHDS – 35th St. access from the north only.
The Retreat – Access from Deon Dr. or from the north on SW 35th St. to Sagebrush.
Beaver Bus – SW 35th St. and President’s House stops will be closed
City buses – No impacts
Thursday, 3/26
35th Street – Open
Western Blvd. – Closed to thru traffic between SW 35th Street and West Hills Rd. Open at end of the work day.
Deon St. – Closed at Western Blvd. (North and south side). Traffic routed through Ivy on the south side and through Sagebrush on the north side.
Washington Way – Open
West Hills Rd. – Closed to thru traffic at Western Blvd. Open at the end of the work day.
OSU Western Building – All parking entrances open, normal access from SW 35th St.
OSU UHDS – Normal access from SW 35th St.
The Retreat – Access from Sagebrush only.
City buses – Stops on Western Blvd. between SW 35th St. and West Hills impacted.
Beaver Bus – No impacts
Friday, 3/27
35th Street – Open
Western Blvd. – Closed to thru traffic between 35th Street and West Hills Rd. Open at end of the work day.
Deon St. – Closed at Western Blvd. (North and south side). Traffic routed through Ivy on the south side and through Sagebrush on the north side.
Washington Way – Open
West Hills Rd. – Closed to thru traffic at Western Blvd. Open at the end of the work day.
OSU Western Building – All parking entrances open, normal access from SW 35th St.
OSU UHDS – Normal access from SW 35th St.
The Retreat – Access from Sagebrush only.
City buses – Stops on Western between 35th and West Hills impacted.
Beaver Bus – No impacts.
For questions or comments about this closure, please contact Josh Bjornstedt.
Due to contractor irrigation and shrub landscape renovation work being performed on the west and north sides of Bexell Hall the red marked sidewalks will be closed for access (see map) beginning Monday, March 23 thru Friday, March 27, 2026 from 7:00 am to 5:00 pm. The green line on the map indicates the travel route around the closure.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences March 12, 2026 6:30 am – 10:00 am. Building occupants may notice slight pressure & air flow changes throughout the building.
For questions or comments on this closure contact Richard Olsen at 541-737-7025.