This is an update to previous notification.

SW Campus Way between 26th St. and Memorial Place will remain closed through Saturday, April 27 to allow completion of the current phase of construction. The road, sidewalk and bike lanes will then be reopened through Sunday, May 5th.

The south entrance of Kelley Engineering Center will remain closed.

Intermittent closures and construction activity in the area will resume on Monday, May 6th.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

Please note: this will NOT be a continuous closure. Expect to see multiple, short-term closures, with the area being reopened for use in between. These short-term closures will be ongoing through June 8.

As part of the Kelley District Utility Plant project, intermittent closures will occur on Campus Way between 26th St. and Memorial Place, starting Monday April 22 through Saturday, June 8. The closures are necessary to allow for crane activity related to the project.

The Kelley Engineering Center south entrance will also be closed.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed intermittently during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

The map shows a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.
The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Jen-Hsun Huang & Lori Mills Huang Collaborative Innovation Complex project, Kelley Engineering Center will be closed to allow for a planned power outage on Tuesday, April 23 from 4:00 – 8:00 A.M. The outage is necessary to establish temporary electrical service for construction at the Huang Collaborative Innovation Complex site.

What do you need to do to prepare for this outage? 
Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Tuesday, April 23. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.

This is a preliminary notification regarding upcoming closures on Campus Way.

Please note: this will NOT be a continuous, long-term closure. Expect to see multiple, short-term closures, with the area being reopened for use in between. A Campus Notification will be sent out for each closure, noting the specific dates and durations.

As part of the Kelley District Utility Plant project, intermittent closures will occur on Campus Way between 26th St. and Memorial Place, near Kelley Engineering Center. The closures are necessary to allow for crane activity related to the project. The closures will occur starting on Monday, April 22 through Saturday, June 8.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed intermittently during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

The Kelley Engineering Center south entrance will also be closed.

The map shows a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.
The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, the steam system in Kelley Engineering Center will be shut down on Friday, March 29 from 10 A.M. to 4 P.M. The building will experience small temperature fluctuations and hot water in restrooms will be limited during the shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, a section of the west sidewalk and bicycle lane on SW Memorial Place will be closed on Friday, March 22 from 5 – 9 A.M. The closures will be located between Kelley Engineering Center and Plageman Student Health Center.

Three service parking spaces on the east side of Memorial Place will also be closed.

Other possible impacts include noise near the work site.

The map shows a sidewalk and bike lane closure on the west side of SW Memorial Place, between Kelley Engineering Center and Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelly District Utility Plant project, Campus Way will be closed between 26th St. and Memorial Place starting Tuesday, March 12 through Friday, March 15 to allow for crane activity. The south entrance of Kelley Engineering Center will be closed.

The north sidewalk in this section of Campus Way will be closed to pedestrians. The south sidewalk will remain open as a detour.

The map shows a road and sidewalk closure on Campus Way between 26th St. and Memorial Place. The roadway is marked as closed. The south entrance at Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open.

Bicycle lanes in this section of Campus Way will be closed in both directions. A bicycle detour will be available along the walkway on the south side of Milam Hall.

The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the Kelley Engineering Center Second Floor Remodel, there will be a building-wide domestic water shutdown at Kelley Engineering Center on Saturday, February 17 from 6 A.M. to 6 P.M. This shutdown will affect bathrooms, kitchens and drinking fountains throughout the building.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

Scheduled: Annual Fire Rollup Door Testing

Effective Date(s):  December 18-20, 2023

An outside contractor will be performing testing on fire rollup doors December 18th-20th .  The testing is approximately ½ hour per door. The door will be closed for that time, and there may be some noise as the door closes and opens. Please see the list of impacted buildings below.

  • Kelley Engineering Center
  • Pharmacy Building
  • Magruder Hall
  • Research Way Building
  • Burt Hall
  • Environmental Health & Safety Annex
  • Austin Hall
  • George W. Peavy Forest Science Center
  • The Valley Library
  • Joyce Collin Furman Hall
  • Gill Coliseum
  • Sports Performance
  • Reser Stadium

For questions or comments on this closure, contact Alarm Shop at 541-737-2969.