Northwest Natural Gas will be performing utilities work at the intersection of SW 35th St. and SW Western Blvd. on Wednesday, May 29. The traffic signal at the intersection will be shut down from 9 A.M. to 4 P.M. Flaggers will be present to direct traffic.
Pedestrian access will be allowed when at all possible and signage will indicate any detours.
For questions or comments on this closure, contact Rob Heiken at (541) 766-6729, ext. 6436.
The traffic signal at the intersection of SW 35th St. and SW Western Blvd. will be shut down on Saturday, April 20 from 7:30 A.M to 3:00 P.M. to facilitate a city of Corvallis utilities project. Traffic will be reduced to one lane in each direction. Flaggers will be present in the area to direct traffic through the intersection.
The crosswalk on the north side of the intersection will be closed for several hours during this project. At least one crosswalk will be open at all times to allow for pedestrian access. Flaggers will be available to assist and direct pedestrians.
For questions or comments on this closure, contact Mark Bauer at (541) 908-7369.
As part of the LaSells Stewart Center Mechanical and Roof Renewal project, a section of the northbound lane on SW 26th St. will be closed on Thursday, November 30th from 7 A.M. to 5 P.M. to allow for crane activity. The lane closure will be located between the intersection with SW Western Blvd. and The LaSells Stewart Center.
In addition, the traffic signals at the intersection of 26th St. and Western Blvd. will be shut down during this closure. Flaggers will be present at the intersection to direct traffic through the area.
The east sidewalk on 26th St. will be closed between Western Blvd. and the CH2M Alumni Center. The west sidewalk will remain open for pedestrians. The walkway on the north side of The LaSells Stewart Center will also be closed. Other possible impacts include noise near the work site.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.