As part of the Washington Way Improvement project, the multi-use path on SW Washington Way between SW 30th and SW 35th St. will be closed from Thursday, July 25 – Friday, August 9. A temporary pedestrian detour will be available along the new pedestrian path located on the north side of Washington Way.

Other possible impacts include noise, dust and mud near the work site.

A map showing a closure of the multi-use path on the south side of SW Washington Way between SW 30th and SW 35th Streets.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, construction activity will be taking place along the Washington Way multi-use path between SW 15th and SW 17th St. starting Wednesday, July 17 through Wednesday, July 24. The multi-use path will remain open. The path will be separated from the work area with construction fencing.

Flaggers will be present to direct pedestrians and vehicles at the intersection of Washington Way and May Ave./17th St.

Other possible impacts include noise, dust and mud near the work area.

A map showing a construction zone on the multi-use path on the south side of Washington Way between SW 15th and SW 17th St. Flagging operations are noted at the intersection of SW May Ave/SW 17th St. and SW Washington Way.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, the multi-use path on the south side of SW Washington Way will be closed between SW 30th and SW 35th St. on Monday, February 12 to allow for construction work near the 30th St intersection.

Other possible impacts include noise, dust and mud near the worksite.

The map shows a closure of the SW Washington Way multi-use path between SW 30th and SW 35th St. A work zone is marked at the intersection of SW 30th St.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.