Due to construction work for a bike garage, a section of parking spaces in the lot at SW 26th St. and Western Blvd. (south of the Health Center/Reser Stadium) will be closed starting Monday, September 21 through Friday, October 9. Construction will continue after 10/9, but the footprint of the closure will be reduced to accommodate Game Day parking needs.

A map showing a closed section in the parking lot south of Reser Stadium.

For questions or comments on this closure, contact Project Manager Eric Smith at (541) 409-5037.

Due to roofing work happening at the Beaver Beginnings Child Care Center, parking spaces along SW 13th St. on the west side of the building and a section of parking spaces in the lot on the north side of the building will be closed starting Thursday, July 30 – Friday, September 4. The parking lot will remain open, other than the few closed spaces.

Southbound traffic on SW 13th St. will be permitted.

A map showing parking space closures on the north and west sides of the Child Care Center.

For questions or comments on this closure, contact Kellen Hendrickson or Scylise Little.

SW 13th St. will be closed from SW A Avenue to SW Washington Ave. starting Monday, May 4 through Wednesday, July 8 to allow for Union Pacific to complete a project at the railroad crossing.

Local traffic will be permitted from SW A Avenue to the railroad tracks, but no vehicles will be allowed to cross the tracks.

A partial closure of the parking lots located between the railroad tracks and SW Washington Ave. will continue through July 8.

Other possible impacts include construction noise near the work area.

A map showing a road and parking lot closure on SW 13th St.

For questions or comments on this closure, contact Project Manager Scott Bond at (541) 974-2520.

Due to construction work happening in the area, parking spaces in lots along SW 13th St., between SW Washington Ave. and the railroad tracks will be closed. The impacted lots are Washington Ave. SW (#3201) and Washington Ave. SE (#3209). The parking spaces will be closed through Friday, June 12. 

A map showing parking lot closures.

For questions or comments on this closure, contact Project Manager Derek Bennett at (541) 609-6111. 

This is an update to a previous notification.

The sidewalk, bike lane and service parking spaces on SW Memorial Place near Kelley Engineering Center have reopened. The KEC east entrances have reopened as well.

For questions or comments on this closure, contact Project Manager Tarrigon Van Denburg at (714) 390-5313.

As part of the Kelley District Utility Plant Project, SW Memorial Place will be closed between SW Campus Way and Plageman Student Health Center to allow for crane activity and equipment delivery. The closure will be in effect starting Tuesday, August 12 from 5 A.M. to 12:00 P.M.

The east entrance to Kelley Engineering Center may be intermittently unavailable. Service parking spaces in this section of Memorial Place will be closed. The east sidewalk on Memorial Place will remain open for pedestrians.

A map showing a road closure on SW Memorial Place.

For questions or comments on this closure, contact Project Manager Tarrigon Van Denburg at (714) 390-5313.