Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): August 7th-August 11th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

August 7th

  • Dryden Hall
  • Peavey Forest Science Center
  • Richardson Hall 

August 8th

  • Energy Center
  • Heckert Lodge
  • Reed Lodge

August 9th

  • Kearney Hall
  • Merryfield Hall          
  • Owen Hall

August 10th

  • Reser Stadium East
  • Valley Football Center

August 11th

  • Gill Coliseum
  • Sports Performance Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

For work related to Pacific Power system upgrades, Pacific Power will perform trenching work along 35th Street through Friday, April 16, 2021. Trenching work will occur in the following areas: near the Energy Center in the Energy Center East Lot (lot #3340), the Energy Center South Lot (lot #3339) and the 35th Street access to the Energy Center. The access along SW Jefferson Way will remain open. This work supports Pacific Power’s power infrastructure and prepares for future upgrades to SW Washington Way.

For questions or comments on this closure, contact Torre Oberg, the project manager with Magnum Power, at 360-703-7432, or OSU Infrastructure Project Manager Aaron Collett at 541-207-2780. Magnum Power is the contractor working with Pacific Power.

35th Street trenching work area map