This is an extension of a previous closure.

The Campus Way multi-use path will be closed daily from 8 A.M until 3 P.M to all vehicle, pedestrian and bicycle traffic through Friday, July 7 for brush clearing and spraying. Work will occur Monday through Friday. The route will reopen after 3 P.M. on weekdays and remain fully open on weekends. The closure will begin just west of the Feed Center and continue down Campus Way to 53rd St.

The map shows a closure on the Campus Way multi-use path, starting just west of the Feed Center and continuing west to 53rd Street.

For questions or comments on this closure, contact Selby Boerman at (541) 737-6078.

SW Campus Way will be closed daily from 8 A.M until 3 P.M to all vehicle, pedestrian and bicycle traffic from June 19th through June 30th for brush clearing and spraying. Work will occur Monday through Friday. The route will reopen after 3 P.M. on weekdays and remain fully open on weekends. The closure will begin just west of the Feed Center and continue down Campus Way to 53rd St.

The map shows a road and multi-modal path closure on SW Campus Way between 35th and 53rd Streets.

For questions or comments on this closure, contact Selby Boerman at (541) 737-6078.

As part of a construction project at the RAIL 244 facility, this is an informational campus-wide notification to inform pedestrian path users about the potential for increased vehicle traffic along Campus Way, between SW 35th Street and SW 53rd Street. Vehicles will be traveling to and from the RAIL facility and the Building 244 construction site. The general contractor for the project will post signs at key points for the duration of the project.

For questions or comments on this closure, please contact Construction Manager Amy Keene at 541-214-1038.

Campus Way area map