For work related to the Fairbanks Hall Renovation Project, planned power outages are scheduled for Tuesday, December 21, 2021 and will impact Langton, Moreland and Waldo halls. Pacific Power and Fortis Construction will coordinate and work to install a new vault, transformer, and feeds during the planned power outages.

For questions or comments on this work, contact Project Manager Amy Keene at 541-737-5312.

For work related to the Community Hall Slope Project, a series of planned power outages scheduled for Monday, December 27, 2021 through Wednesday, December 29, 2021 are canceled due to inclement weather. Dates and times for the planned outages will be rescheduled.

For questions or comments on this work, contact Construction Manager Ryan Wilson at 503-779-3488.

As part of the Community Hall Slope Project, a temporary planned power outage at the Hattie Redmond Women & Gender Center is scheduled for Monday, November 8, 2021 from 7-8 a.m. Power is expected to be off for less than an hour.

For questions or comments about the planned power outage, contact Project Manager Lindsey Austin at 541-990-7720.

Hattie Redmond Women & Gender Center area map

For work related to the Arts and Education Complex project, a planned power shutdown for the old heat plant is scheduled between 8 a.m. and 4 p.m. on Tuesday, September 14, 2021 due to new electrical service being added to the building. A backup generator for the steam tunnel will be on during the shutdown.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Old heat plant area map

As part of the Arts and Education Complex project, a temporary power shutdown to the former Facilities Services Shops buildings, located along SW 15th Street, is scheduled to occur from 8-9 a.m. on Wednesday, Aug. 4, 2021. The power to the former shops buildings will be disconnected.This may cause a temporary disruption to power for the former heat plant.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Former Facilities Services Shops buildings area map

As part of the Magruder Hall Renovation and Addition, chiller 4 at Magruder Hall is scheduled to be shut down for wiring work (view map). The shutdown is scheduled to start on Thursday, Nov. 5 through Saturday, Nov. 7, 2020. The chiller will be off for a total of three days. The main panel will be turned off and a planned electrical shutdown for the building will occur for approximately two hours on Saturday, Nov. 7.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Magruder Hall area map

As part of the Nash Elevator Project, work will be done to remove and replace an electrical panel in Nash Hall. This will impact the Reverse Osmosis De-Ionized water system in Nash Hall. Work is scheduled to occur all day on Thursday, Sept. 24, 2020.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor David Dukes at 541-951-6534.

Nash Hall area map