As part of the Research Way Lab Building Renovation Project, a water source heat pump above the ceiling at lobby 2000 will be replaced. Work is scheduled to begin on Friday Oct. 23, 2020 through Wednesday, Oct. 28, 2020. Work will take place on the second floor of the building.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302 or Construction Manager Amy Keene at 541-214-1038.

Map of work area

For work related to the Buxton Hall roof replacement, there will be a crane at Buxton Hall offloading material from the roof. Both lanes of SW Jefferson Way will be closed at the corner of SW Weatherford Place. The south sidewalk will also be closed to pedestrian traffic at this location. SW Weatherford Place between SW Jefferson Way and SW Intramural Lane will also be closed. The closure is scheduled for Friday, Oct. 16, 2020, from 9 a.m. to 5 p.m.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Buxton Hall and SW Jefferson Way area map

Notice:  Water Shutdown Crop Science Building  

Effective Date(s): October 15th 6:00am – 9:00 am

The building water for Crop Science will be shutdown to repairs, October 15th, 2020 from 6:00 am. 9:00 am.  This will affect all potable water, building wide.  Restrooms will be temporarily out of order and signage will be in place. 

For questions or comments on this closure, contact Facilities Services at 541-737-2969.

The building water supply for Gilmore Hall will be shutdown to repair a water line on Tuesday, October 6th, 2020 from 6:00 am. to October 7th, 5:00 pm.  This will affect all water supply, building wide.  Restrooms will be temporarily out of order and signage will be in place. 

For questions or comments on this closure, contact Dennis Reichuber  at 541-602-8286.

For work related to the Buxton Hall and Hawley Hall roof replacements, both lanes of SW Jefferson Way will be closed between SW Weatherford Place and SW Sackett Place. The closure is scheduled to run from 7 a.m. to 10 a.m., Friday, Sept. 25, 2020.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

SW Jefferson Way area map

As part of the Research Way Lab Building Renovation Project, the fire sprinkler system at the Research Way Lab Building needs to be shutdown to repair a leaking sprinkler head on the second floor in Open Office area room #2180. The location of the work is toward the west end of 2180 and will not impact any of the offices or office cubicles.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302 or Construction Manager Amy Keene at 541-214-1038.

Research Way Lab Building area map

For work related to the Buxton Hall and Hawley Hall roof replacements, both lanes of SW Jefferson Way will be closed between SW Weatherford Place and SW Sackett Place (view map). A crane will be on site installing rock ballast and insulation on the roofs of Buxton Hall and Hawley Hall. The closure is scheduled to start on Wednesday, Sept. 23 to Thursday, Sept. 24, 2020, 7 a.m. to 5 p.m. daily.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

SW Jefferson Way area map