As part of the Buxton Hall Roof Replacement Project, there will be a crane at Buxton Hall offloading material. One lane of SW Jefferson Way will be closed between SW Weatherford Place and SW Sackett Place. The closure is scheduled for Monday, Aug. 17, 2020 from 7 a.m. to 5 p.m.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

SW Jefferson Way area map

As part of the Buxton Hall Roof Replacement Project, the sidewalk on the south side of SW Jefferson Way from SW Weatherford Place to SW Sackett Place will be closed to support dumpster placement. The closure is scheduled to start on Friday, Aug. 14 through Friday, Sept. 4, 2020.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

SW Jefferson Way sidewalk closure area map

Closure extended: For work related to the Cauthorn Hall fire suppression installation, SW Intramural Lane will be closed between SW Weatherford Place and SW 30th Street. The closure is scheduled to start on Friday, Aug. 14 through Friday, Sept. 4, 2020.

For questions or comments on this closure, contact Patrick Robinson at 541-737-2428.

SW Intramural Lane area map

As part of the Gilbert Hall Chiller Replacement Project, parking lot #3222 (Weniger Hall East Lot) will be closed for standing a crane pick for the placement of a rooftop chiller on Gilbert Hall. The lot closure is scheduled for Saturday, Aug. 1, 2020 from 7 a.m. to 12 p.m.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Parking lot #3222 (Weniger Hall East Lot)
Parking lot #3222 (Weniger Hall East Lot)

As part of the Nash Elevator Project, concrete vehicles will be entering/exiting from Campus Way and stage along the path from Campus Way northeast of Nash Hall for concrete pumping. Please use the southwest entrance to Nash Hall during construction activity on Thursday, July 30, 2020.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Nash Hall area map

Parking lot #3250 and the loading dock area of the Pharmacy Building will be closed for a roof crane pick for work related to the Pharmacy Building 305 Classroom. The closure is scheduled for Friday, July 24, 2020 from 7 a.m. to 12 p.m.