As part of the Gilbert Hall Chiller Replacement Project, parking lot #3222 (Weniger Hall East Lot) will be closed for standing a crane pick for the placement of a rooftop chiller on Gilbert Hall. The lot closure is scheduled for Saturday, Aug. 1, 2020 from 7 a.m. to 12 p.m.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Parking lot #3222 (Weniger Hall East Lot)
Parking lot #3222 (Weniger Hall East Lot)

As part of the Nash Elevator Project, concrete vehicles will be entering/exiting from Campus Way and stage along the path from Campus Way northeast of Nash Hall for concrete pumping. Please use the southwest entrance to Nash Hall during construction activity on Thursday, July 30, 2020.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Nash Hall area map

Parking lot #3250 and the loading dock area of the Pharmacy Building will be closed for a roof crane pick for work related to the Pharmacy Building 305 Classroom. The closure is scheduled for Friday, July 24, 2020 from 7 a.m. to 12 p.m.

For questions or comments on this closure, contact Project Manager John Doty at  541-740-8302.

Lot #3250 area map

As part of the summer 2020 parking lot paving schedule, parking lot closures for asphalt renewal are planned for the following parking lots: #3278 (Sports Complex East), #3205 (Adams Northeast) and #3313 (Bates North). The lots will be fully or partially closed for construction and planned closure durations are subject to change as construction proceeds.

Work for lot #3313 (Bates North) started on Thursday, July 23 and continues through Monday, Aug. 24, 2020. Work for lot #3205 (Adams Northeast) started on Friday, Aug. 7, 2020 and continues through Tuesday, Sept. 1. Work for lot #3278 (Sports Complex East) started on Friday, Aug. 7 and is extended through Tuesday, Sept. 15, 2020.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Bates North lot #3313 area map
Bates North lot #3313 area map
Adams Northeast lot #3205 area map
Adams Northeast lot #3205 area map
Sports Complex East lot #3278 area map
Sports Complex East lot #3278 area map

As part of the Merryfield Hall Renovation Project, a planned power shutdown is scheduled for Merryfield and Kearney halls so the power can be upgraded to Merryfield Hall. A new transformer will feed both Merryfield and Kearney halls. A generator is being provided to feed the IT room in Kearney Hall and one lab in Merryfield Hall. The power shutdown is scheduled to occur from 8 a.m. on Monday, July 20 to 4 p.m. on Tuesday, July 21, 2020.

For questions or comments on this closure, contact Construction Manager Dave Raleigh at 541-230-0804 or Construction Manager Jason Lundy at 541-270-0193.

Merryfield and Kearney halls area map

As part of the Dearborn Hall Structural Repair work, part of parking lot #3221 will be closed for the delivery of beams and columns to the Dearborn Hall basement. The partial parking lot closure is scheduled for Tuesday, July 14, 2020 from 7 a.m. to 10 a.m.

For questions or comments on this closure, contact Construction Manager Dave Raleigh at 541-230-0804.

Parking lot #3221 partial closure area map

As part of the SW Weatherford Place ADA Upgrade work, SW Weatherford Place will be closed to all vehicle and pedestrian traffic between SW Jefferson Way and SW Intramural Lane. The closure is scheduled to start on Monday, July 13 through Friday, August 14, 2020.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.

SW Weatherford Place closure area map