As part of the Cordley Hall Renewal project,  a natural gas shutdown will occur today, Friday July 21 that will result in no natural gas service in Nash Hall and ALS, lasting until 3 pm. Northwest Natural Gas will be working in the area south of Cordley Hall east and will protrude into Campus Way.

Emergency natural gas shutdown for Nash Hall and ALS on July 21, 2023.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193. 

As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Tuesday, June 27 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.

The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

The parking lots south and east of Graf Hall (Lot 3221) will be closed for the entire day, March 30, 2023, to stripe the asphalt paving. No vehicular or pedestrian traffic will be allowed. Note that this work is weather-dependent; work will be postponed if it is raining. An updated campus notification will be sent out if this occurs.

Parking lot south of Graf Hall at Oregon State University closed March 30

For questions or comments on this closure, contact Project Manager Dave Amundson

As part of the Washington Way Improvement Projectsignificant traffic impacts will occur the week of December 12 through December 16, 2022, along and near SW Washington Way:

  • Monday 12/12/22 – The intersection of SW 26th Street & SW Washington Way will be flagged. Only northbound traffic will be allowed on SW 26th Street north of SW Washington Way to SW Intramural Way.
  • 12/13/22 – The intersection of SW 26th St & SW Washington Way will be closed for waterline installation.
  • 12/14 & 12/15 – SW Washington Way closed from 26th Street to 30th Street for waterline installation.
  • Friday 12/16/22 – SW Washington Way closed from 17th Street to 26th Street & 26th Street to 30th Street for paving. The intersection at 26th Street & Washington Way will be open.
Washington Way Construction Impacts 12/12-12/16

For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111. 

As part of the Whyte Track and Field Center Grandstands project, work will occur at the Whyte Track and Field facility. Use caution when entering and exiting the Sports Complex West Parking Lot, as there will be truck traffic entering and exiting the parking lot. Work is scheduled to take place between 7 a.m. and 6 p.m. daily, starting on Monday, December 12, 2022 through Friday, October 2, 2023.

For questions or comments on this closure, contact Project Manager Scott Bond at 541-974-2520.

As part of the Washington Way Improvement Project,  SW Washington Way will be closed daily between SW 26th and SW 17th Streets to begin water line replacement. Work will occur starting November 30, 2022 until January 6, 2023 from 7 a.m.-5 p.m. daily. This portion of Washington Way will be reopen to vehicle traffic after 5 p.m. daily.

The sidewalk on the north side of Washington Way will also be closed, and an alternate pedestrian route will be identified with signage.

For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111.