As part of the Washington Way Improvement project, one lane on the north side of the intersection of SW 26th St. and SW Washington Way will be closed to vehicle traffic on Wednesday, June 14 from 7 A.M. to 9 A.M. The other two lanes will remain open at all times. Sidewalks and crosswalks will not be impacted. Other impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Project Manager Aaron Amoth at (541) 207-5084
As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, June 9 from 8 A.M. to 1 P.M. The B2 parking lot east of the LaSells Stewart Center will also be closed.
The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind the LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the Bloss Hall South Parking Lot.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
As part of the Completing Reser Stadium Project, flaggers will be present on SW 26th St. just south of the LaSells Stewart Center on Friday, June 2 from 12 – 4 P.M. Workers will be removing temporary pavement markings in the area. The street will remain open to all traffic, but minor delays should be expected.
For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.
As part of the Dixon Recreation Center Pool System Replacement & HVAC Project, a crane will be placed in the Dixon East Parking Lot on Monday, June 5 from 6 A.M. to 12 P.M. The parking lot will remain open, but two ADA parking spaces and one loading zone space will be closed on the north side of the parking lot. Pedestrian access will be maintained along the sidewalk closest to Goss Stadium.
For questions or comments on this closure, contact Construction Manager Eric Smith (541) 409-5037.
As part of the 2023 Street Safety Project, SW Campus Way between SW 14th St. and SW Pioneer Place will be closed on Wednesday, May 31 from 7 A.M to 5 P.M., except to allow traffic to exit eastbound from Pioneer Place. Workers in the area will be directing traffic, moving equipment and allowing drivers to exit from Pioneer Place as necessary. The westbound lane from 14th St to Pioneer Place will be closed to all traffic. Vehicles needing access to Pioneer Place may detour around the work area via SW Jefferson Way and enter from the eastbound lane on Campus Way. Please see detour map for reference.
In addition, the dedicated parking spaces for the School of Civil and Construction Engineering will be closed for the duration of the project.
Sidewalks will remain open for pedestrians. Other possible impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.
As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, May 26 from 7 A.M. to 1 P.M. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. The west sidewalk on Stadium Ave. will be closed. The east sidewalk on Stadium Ave. will remain open for pedestrians. A vehicle detour will be available from Western Blvd. along the east and north side of the Bloss Hall South Parking Lot.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740 – 5260.
SW Campus Way will be closed daily from 8 A.M until 3 P.M to all vehicle, pedestrian and bicycle traffic from June 19th through June 30th for brush clearing and spraying. Work will occur Monday through Friday. The route will reopen after 3 P.M. on weekdays and remain fully open on weekends. The closure will begin just west of the Feed Center and continue down Campus Way to 53rd St.
For questions or comments on this closure, contact Selby Boerman at (541) 737-6078.
As part of the Reser Stadium project, a crane will be present in Parker Plaza near the front entrance of Reser Stadium at the corner of SW 26th St. and SW Ralph Miller Lane. The crane will be in place from Monday, May 22 through Friday, May 26. The sidewalks and streets will remain open.
For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.
The hot water will be shut down in Gill Coliseum May 27, 2023 from 6:00 am to 6:00 pm to work on the tie ins that serve the new heat exchangers. This will affect the hot water building wide.
For questions or comments on this shutdown contact, Facilities Services at 541-737-2969.
As part of the West Greenhouse Improvement Project, a section of the eastbound lane on SW Campus Way will be closed along with a section of the south sidewalk on Friday, May 5 from 7 AM to 4PM. The impacted section is located between SW 30th and SW 35th Streets in front of the Motor Pool West and National Forage Seed Center East parking lots. The parking lots will remain open. However, the east entrance to the NFSC East parking lot will be closed and multiple parking spaces will be unavailable.
Drivers should expect to see flaggers directing traffic around the closure. A pedestrian detour will be available along the north sidewalk.
For questions or comments on this closure, contact Construction Manager Scylise Little.