As part of the Kelley District Utility Plant project, the steam system in Kelley Engineering Center will be shut down on Friday, March 29 from 10 A.M. to 4 P.M. The building will experience small temperature fluctuations and hot water in restrooms will be limited during the shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Pride Center Renovation project, the entrance to the B2 parking lot on SW A Avenue (west of the Pride Center) will be closed starting Wednesday March 27 through Friday, March 29. This closure will be in effect from 7 A.M. to 4 P.M. daily. The parking lot will remain fully open. The entrance lane will be closed; the exit lane will remain open.

Alternate entrances will be available on SW 17th St. and SW 15th St.

For questions or comments on this closure, contact Construction Manager Scylise Little.

All steam services will be shut down to Snell Hall, from Tuesday, March 26 at 6:30 a.m.- Thursday March 28 3:30 p.m., 2024, to replace multiple failed steam valves. This will affect all steam services building wide. Building occupants may notice air temperature fluctuations during this time and there will be no hot water.

For questions or comments on this closure, contact Jesse Nunez at 541-737-5954.

As part of the Cordley Hall Renewal project, testing of the fire alarm system and FDC System during the week of Spring Break (March 25 through March 28) will occur at Cordley Hall – East. Corvallis Fire Department will be on site testing the fire department connection and venting water from the roof of Cordley Hall – East on the afternoon of March 27th

Cordely Hall fire alarm testing week of spring break March 25 through March 28

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193. 

All steam services will be shut down to Linus Pauling Science Center today, Thursday, March 21 from 1 p.m. through tomorrow, Friday, March 22 at 4 p.m. while a contractor replaces a failed steam pressure regulator.  Building occupants may experience some air temperature fluctuations but the backup boiler for the building will be operational during this time.

For questions or comments on this closure, contact Facilities Services  at 541-737-2969.

The North District Utility Plant will be shut down Wednesday morning, April 3rd, from 7am – 12pm to allow for an electrical contractor to replace recalled circuit breakers under warranty. This will affect chilled water delivery to ALS, Nash and Burt Hall and could cause some building temperature fluctuations.

For questions or comments on this closure, contact Sean Olsen at 541-737-2969.

As part of the Kelley District Utility Plant project, a section of the west sidewalk and bicycle lane on SW Memorial Place will be closed on Friday, March 22 from 5 – 9 A.M. The closures will be located between Kelley Engineering Center and Plageman Student Health Center.

Three service parking spaces on the east side of Memorial Place will also be closed.

Other possible impacts include noise near the work site.

The map shows a sidewalk and bike lane closure on the west side of SW Memorial Place, between Kelley Engineering Center and Plageman Student Health Center.