Update: Repairs are scheduled for 12/20/22

Due to a failed component in the heat exchanger, the south end of Magruder Hall on both the 1st and 2nd floors will be experiencing cooler-than-normal temperatures. This will affect the heating for the South end of the building as well as domestic hot water. A restoral date is unknown at this time. Updates will be provided when they are available. 

For questions or comments on this notice contact, Andy Gray at 541-737-2969.

Notice: Domestic Water Shutdown in Rogers Hall 

Effective Date(s): December 14, 2022, 6:00 am – December 15, 2022, 6:00 pm.

The water will be shut down in Rogers Hall December 14, 2022, from 6:00 am to December 15, 2022 6:00 pm to remove and install new backflows. This will affect the domestic water building wide.

For questions or comments on this shutdown contact, Facilities Services at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

The fume hoods in Linus Pauling Science Center will be shut down for repairs to replace several failed motors in the exhaust fan system.  Maintenance work on the lab exhaust fan system will be from December 14, 7:00 am – December 15, 2022 5:00 pm.  All fume hoods will have low flow so they will be inoperable during this time.  

For questions or comments on this closure contact Richard Olsen 541-737-7025. If there are lab-specific concerns about exhaust airflow contact EH&S at 541-737-2273.

As part of the Community Hall Slope project, the walkway south of the pharmacy building will be closed to allow for railing installation.  ADA parking spots in the Furman Hall/South Pharmacy parking lot will also be unavailable during this time. However, ADA access to buildings will be maintained.

Noise impacts include cutting and jackhammering concrete.

For questions or comments on this closure, contact Construction Project Manager Scott Bond at 541-974-2520.

As part of the Fairbanks Hall renovation project, the parking lot west of Fairbanks Hall will be closed for Winter Break to allow for scheduled contractor work to be executed efficiently.

Spaces with EV stations and ADA spaces located in this lot will be offline for use.

For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.

As part of the Washington Way Improvement Projectsignificant traffic impacts will occur the week of December 12 through December 16, 2022, along and near SW Washington Way:

  • Monday 12/12/22 – The intersection of SW 26th Street & SW Washington Way will be flagged. Only northbound traffic will be allowed on SW 26th Street north of SW Washington Way to SW Intramural Way.
  • 12/13/22 – The intersection of SW 26th St & SW Washington Way will be closed for waterline installation.
  • 12/14 & 12/15 – SW Washington Way closed from 26th Street to 30th Street for waterline installation.
  • Friday 12/16/22 – SW Washington Way closed from 17th Street to 26th Street & 26th Street to 30th Street for paving. The intersection at 26th Street & Washington Way will be open.
Washington Way Construction Impacts 12/12-12/16

For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111.