2/24/2023: Hot water has been restored.

The domestic hot water is shut down in Austin Hall for emergency repairs as of February 17, 2023. This will affect all domestic hot water building wide. The restoral of domestic hot water is unknown currently due to the repair requiring a specialty part. A second notice will follow when the repair is complete and domestic hot water has been restored. 

As part of the Pride Center Renovation project, the sidewalk on the north side of SW A Avenue will be closed between 15th and 16th Streets. Three city parking spaces in front of the Pride Center will also be closed. The crosswalk and south sidewalk will remain open to pedestrians. Other possible impacts include noise, dust and mud near the construction site.

For questions or comments on this closure, contact Construction Manager Scylise Little.  

As part of the Washington Way Improvement project, Washington Way between 17th & 26th streets will be closed to vehicle traffic to allow for storm drain installation. Pedestrian access will be maintained along the walkway on the south side of Washington Way.

Other possible impacts include dust, mud and noise near the construction site.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.

As part of the Pride Center Renovation project, the SW 16th St. entrance to the parking lot directly west of the Pride Center (SW 17th St./SW A Ave.) will be closed on Feb. 10th from 8AM – 11AM. All other entrances to the parking lot will remain open. Please see map for alternate routes.

Other possible impacts include noise, dust and mud near the construction site.

Map showing a parking lot entrance closure at SW A Avenue and SW 16th St.

For questions or comments on this closure, contact Construction Manager Scylise Little.

As part of the Whyte Track & Softball Scoreboard project, three streetlights on the north side of the Whyte Track and Softball parking lot will be removed to allow for sidewalk construction and site work. New lights will be installed later this spring. Other possible impacts include noise and dust near the construction site.

Map showing the position of three street lights at the north side of the Whyte Track and Softball parking lot.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111 .

As part of the Community Hall Slope project, the walkway located on the south side of the Pharmacy Building will be closed from 2/8 -2/10/23 for handrail installation. The ADA parking spots in the south Pharmacy/Furman parking lot will also be closed during this time. ADA access to buildings in the area will be maintained. Minor noise impacts are also possible.

A map showing the walkway south of the Pharmacy Building with a highlighted section indicating the work area.

For questions or comments on this closure, contact Construction Manager Scott Bond at (541) 974-2520.  

As part of the Pride Center Renovation project, SW May Ave. between the Pride Center and Adams Hall will be closed from 8:00AM – 2:00PM on Tuesday, February 7th. Access to the parking lots on the corners of SW A Ave./SW 17th St. and SW May Ave. /SW A Ave. will be maintained. Please refer to the map below for alternate routes.

For questions or comments on this closure, contact Construction Manager Scylise Little.

As part of the Pride Center Renovation project, the SW May Ave. and SW 16th St. entrances to the parking lot located at SW 17th and SW A Ave will be closed on Monday, Feb. 6th from 7:00 AM – 11:00 AM. The parking lot will remain open with access maintained at several other entrances. See map for alternate routes.

For questions or comments on this closure, contact Construction Manager Syclise Little.