A previous version of this notification mistakenly listed the effective dates as 11/18 and 11/20. This closure will only be in effect on Wednesday, Nov. 20th.
For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.
As part of the Jen-Hsun Huang & Lori Mills Huang Collaborative Innovation Complex project, a vacuum truck will be excavating an area within the construction site on the east side of SW 26th St. between NW Orchard Ave. and NW Monroe Ave.
This work will increase construction noise in the surrounding area starting Tuesday, Nov. 19th through Wednesday, Nov. 20th.
For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.
The water both domestic and industrial will be shut down in Nash Hall November 23, 2024 from 6:00 am to 6:00 pm to replace drain lines in basement area. This will affect all domestic and industrial water and drains building wide.
EH&S has asked us to remind building occupants thatwater will not be available to emergency eyewash/shower units, and occupants should discontinue all hazardous substance use (chemicals, unsealed radioisotopes, and biohazardous materials) for the duration of the shutdown
For questions or comments on this notice contact, Andy Gray at 541-737-7651.
As part of the Washington Way Improvement project, flaggers will be controlling traffic in all directions at the intersection of SW Washington Way and SW 26th St. starting on Monday, Nov. 18th and continuing through Wednesday, Dec. 4th.
In addition, the sidewalks on 26th St. north of Washington Way will be closed as follows:
11/18 – 11/19: a small section of the west sidewalk will be closed just north of the intersection. A detour will be available on the sidewalk bordering Student Legacy Park.
11/20 – 11/21: the east sidewalk will be closed between Dixon Recreation Center and Washington Way. A detour will be available along the walkway bordering the sand volleyball courts.
Other possible impacts include noise, dust and mud near the work area.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
As part of the Collaborative Aerospace Research Center Renovation project, survey work will be conducted along SW 30th St. between Reser Stadium and the Nancy Squires Aerospace Research Center site on Monday, Nov. 18th and Wednesday, Nov. 20th.
The work will require single lane closures on SW 30th St. Flaggers will be present to present to direct traffic through the work zone and allow cars to safely enter and exit the parking lots. Sidewalks will remain open and flaggers will assist pedestrians as needed.
For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.
As part of the Bloss Hall Renovation project, a small section of the sidewalk running between Bloss Hall and the International Living-Learning Center will be closed starting Friday, Nov. 15th through Tuesday, Nov. 19th.
For questions or comments on this closure, contact Josh Walsh at (541) 737-0927.
A vacuum truck will be excavating an area within the Jen-Hsun Huang & Lori Mills Huang Collaborative Innovation Complex construction site, on the east side of SW 26th St. Occupants in the surrounding buildings may notice an increase in construction noise through Thursday, November 14.
For questions or comments, contact Construction Manager Jason Lundy at (541) 270-0193.
The domestic water will be shut down at Research Way Building November 6th, 2024, at 1:00 pm until November 8th, 2024, at 4:30 pm in order to facilitate emergency sewer line repairs. This will affect all domestic water building wide, including kitchens and restrooms. Portable restrooms and handwashing stations have been placed on site. Restrooms are also available across the street at the Coast Range Building.
For questions or comments on this notice contact, Richard Olsen at 541-737-7025.
Otis will be conducting routine elevator safety testing November 7th, 2024 – November 15th, 2024. Testing will take place in the buildings listed below and be completed between 7 am -5 pm. Each unit will be out of service for approximately 2-3 hours at a time. Signage will be posted on elevator doors and call buttons while testing is being conducted. For buildings with two or more elevators, only one elevator will be out of service at a time.
November 7
Memorial Union
November 8
Strand Agriculture Hall
Cascade Hall
November 13
University Plaza
Reed Lodge
Kidder Hall
November 14
Hallie E. Ford Center
Dixon Recreation Center
Women’s Building
November 15
Wilkinson Hall
OSU Parking Structure
For questions or comments on this notice contact, Brandon Holden at 541-737-8313.
On Thursday, November 7th, 2024 from 6:00 am – 8:00 pm, the parking lot south of University Plaza (view map) will be partially closed to accommodate the crane for removal and reinstallation of new HVAC equipment onto the roof.
For questions or comments on this closure, contact Justin Fuszek at 541-737-1296.