Power will be shut down at Plageman Student Health Center, building-wide to make necessary repairs to the standby transfer switch. This shutdown will occur on January 3rd, 2023, from 5 am – 8 am.
Category Archives: Buildings
12/19/22 Crane Placement In Graf Hall Parking Lot Within Fenced Construction Area
As part of the Graf Hall Renovation project, a crane will be placed in the Graf parking lot within the fenced construction area. Because the crane will remain within the established construction site, any additional impacts to campus residents, visitors and the surrounding neighborhood are expected to be minimal.
For questions or comments on this project, contact Marty Waldo with Fortis Construction at (503) 894-4092.
12/20/22 Emergency: Magruder Hall Heating and Domestic Hot Water Shutdown 12/20/22
To make emergency repairs on a failed component in the heat exchanger, the unit will be shut down on Tuesday, December 20, 2022, 8:00 am -4:30 pm. This will affect the heating for the South end of the building as well as domestic hot water.
For questions or comments on this notice contact, Andy Gray at 541-737-2969.
12/27/22 – 08/31/24: Closure of Orchard Ave. Parking Lot North of Withycombe Hall
As part of the Withycombe Hall Renovation project, the Orchard Avenue parking lot directly north of Withycombe Hall will be closed. This project includes extensive improvements to both the east and west sides of the building.
For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.
12/14/22: Notice-Magruder Hall Heating and Domestic Water Temperature Fluctuations
Update: Repairs are scheduled for 12/20/22
Due to a failed component in the heat exchanger, the south end of Magruder Hall on both the 1st and 2nd floors will be experiencing cooler-than-normal temperatures. This will affect the heating for the South end of the building as well as domestic hot water. A restoral date is unknown at this time. Updates will be provided when they are available.
For questions or comments on this notice contact, Andy Gray at 541-737-2969.
12/14-12/15 Notice: Domestic Water Shutdown in Rogers Hall
Notice: Domestic Water Shutdown in Rogers Hall
Effective Date(s): December 14, 2022, 6:00 am – December 15, 2022, 6:00 pm.
The water will be shut down in Rogers Hall December 14, 2022, from 6:00 am to December 15, 2022 6:00 pm to remove and install new backflows. This will affect the domestic water building wide.
For questions or comments on this shutdown contact, Facilities Services at 541-737-2969.
Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.
Please forward this notice to anyone who would benefit from this information.
12/13-12/16/22: Walkway & ADA Parking Spaces On South Side Of Pharmacy Building Closed For Railing Installation
As part of the Community Hall Slope project, the walkway south of the pharmacy building will be closed to allow for railing installation. ADA parking spots in the Furman Hall/South Pharmacy parking lot will also be unavailable during this time. However, ADA access to buildings will be maintained.
Noise impacts include cutting and jackhammering concrete.
For questions or comments on this closure, contact Construction Project Manager Scott Bond at 541-974-2520.
12/12/22 – 01/06/23: Parking lot west of Fairbanks Hall closed for Winter Break
As part of the Fairbanks Hall renovation project, the parking lot west of Fairbanks Hall will be closed for Winter Break to allow for scheduled contractor work to be executed efficiently.
Spaces with EV stations and ADA spaces located in this lot will be offline for use.
For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.
12/12/22: Water service shutoff to Dixon Recreation Center
As part of the Washington Way Improvement Project, water service to Dixon Recreation Center will be turned off to allow the replacement of a water valve in Washington Way. Dixon Rec Center will open at 3 pm to allow for this replacement work.
For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111.
11/21/22: Intermittent elevator interruptions in Cordley Hall West
As part of the Cordley Hall Renewal Project, there will be intermittent elevator interruptions in Cordley Hall West. Work is scheduled to take place between 8 p.m. and 5 p.m. on Monday, November 21, 2022.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.