As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 26 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.

The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the West Greenhouse Improvement Project, a section of the westbound lane and the north sidewalk on SW Campus Way will be closed between the greenhouses and the Seed Laboratory on Thursday, June 22 from 10 A.M. to 2 P.M. The impacted section is located in front of the West Greenhouse Complex parking lot entrance. Drivers should expect to see flaggers in the area. Pedestrians may detour around the closure using the crosswalks located at SW 30th Street. and the Seed Laboratory.

The map shows SW Campus Way between SW 30th and SW 35th Streets with a section of the westbound lane marked as closed in front of the West Greenhouse Complex parking lot entrance. A section of the north sidewalk in the same location is also marked as closed. A pedestrian detour is marked with crosswalks shown at SW 30th St. and the Seed Laboratory. The eastbound lane is marked as a detour for vehicles.

For questions or comments on this closure, contact Construction Manager Scylise Little.

As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 19 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.

The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

The HVAC system in the Agriculture and Life Sciences Building will undergo air handler testing on Monday, June 19 from 8 A.M. to 3 P.M. The testing process will involve intermittent system shutdown. Airflow and building pressure will be affected, but impacts will be minimal and of short duration. Building exhaust systems and fume hoods will not be affected during the shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, June 9 from 8 A.M. to 1 P.M. The B2 parking lot east of the LaSells Stewart Center will also be closed.  

The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind the LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the Bloss Hall South Parking Lot.

The map shows a road and sidewalk closure along SW Stadium Ave. directly behind the LaSells Stewart Center. The B2 parking lot to the east of the LaSells Stewart Center is also shown as closed. A detour is marked from SW Western Blvd. along the east and north side of the Bloss Hall South parking lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Completing Reser Stadium Project, flaggers will be present on SW 26th St. just south of the LaSells Stewart Center on Friday, June 2 from 12 – 4 P.M. Workers will be removing temporary pavement markings in the area. The street will remain open to all traffic, but minor delays should be expected.

The image shows the temporary crosswalk and pedestrian walkway which crosses SW 26th St. just south of the LaSells Stewart Center and continues into the parking lot at Reser Stadium.

For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.

As part of the Dixon Recreation Center Pool System Replacement & HVAC Project, a crane will be placed in the Dixon East Parking Lot on Monday, June 5 from 6 A.M. to 12 P.M. The parking lot will remain open, but two ADA parking spaces and one loading zone space will be closed on the north side of the parking lot. Pedestrian access will be maintained along the sidewalk closest to Goss Stadium.

For questions or comments on this closure, contact Construction Manager Eric Smith (541) 409-5037.  

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, May 26 from 7 A.M. to 1 P.M. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. The west sidewalk on Stadium Ave. will be closed. The east sidewalk on Stadium Ave. will remain open for pedestrians. A vehicle detour will be available from Western Blvd. along the east and north side of the Bloss Hall South Parking Lot.

The map shows a section of SW Stadium Ave. as closed from SW Western Blvd. to just south of Bloss Hall. The west sidewalk on Stadium Ave. is marked as closed. A vehicle detour is marked from Western Blvd around the east and north sides of the Bloss Hall South Parking Lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740 – 5260.