As part of the Dixon Recreation Center Pool System Replacement & HVAC Project, a crane will be placed in the Dixon East Parking Lot on Monday, June 5 from 6 A.M. to 12 P.M. The parking lot will remain open, but two ADA parking spaces and one loading zone space will be closed on the north side of the parking lot. Pedestrian access will be maintained along the sidewalk closest to Goss Stadium.

For questions or comments on this closure, contact Construction Manager Eric Smith (541) 409-5037.  

Print Friendly, PDF & Email

Comments are closed.