Two major projects related to the Washington Way Improvement Project will impact campus starting Monday, June 19 and continuing throughout the summer.

Washington Way will be fully closed between 17th and 26th Streets from June 20 through September 25 for road reconstruction work. The sidewalks on both sides of Washington Way will remain open.

The map shows a road closure on SW Washington Way between SW 17th and SW 26th Streets.

A second closure will impact 26th Street starting at the Washington Way intersection and extending 200 ft. to the north. This closure will be in effect from June 19 through July 3. The closure includes the entire roadway and the west sidewalk on 26th St. Parking spaces on the east side of 26th St. will remain open during construction.

The map shows a road closure on SW 26th Street between SW Washington Way and SW Intramural Lane. The sidewalk on the west side of SW 26th Street is also shown as closed.

For questions or comments on these closures, contact Construction Manager Derek Bennett at (541) 609-6111.  

The northbound lane and bike lane on SW 26th St. will be closed in front of the OSU Beaver Store entrance on Monday, June 19 from approximately 10 A.M. to 2 P.M. to allow for crane work. Drivers should expect to see flaggers in the area. The sidewalk in front of the OSU Beaver Store will also be closed and pedestrians will be detoured across 26th St. to the west sidewalk.

The map shows a vehicle and bike lane closure in the northbound lane of SW 26th Street in front of the OSU Beaver Store.

For questions or comments on this closure, contact OSU Beaver Store Facilities Coordinator Sean Immel at (541) 760-3948.