The District Utility Plant will be shut down Friday morning February 23rd from 8 am – 2 pm to allow for new piping supplying Burt Hall to be connected to the system and properly bled. This will affect chilled water delivery to ALS, Nash and Cordley and could cause some building temperature fluctuations.
For questions or comments on this closure contact Reice Moyer at 541-737-2969.
The industrial & domestic hot water will be shut down in Nash Hall February 24, 2024 from 7:00 am to 12:00 pm for repairs. This will affect the industrial & domestic hot water building wide.
For questions or comments on this notice contact, Facilities Services at 541-737-2969.
Please note that this shut down has been revised with extended dates. As part of the Nash Hall Process Water Tower Replacement project, the process water loop at Nash Hall will be shut down from Thursday, November 9 through Monday, November 13 at noon.
As part of the Nash Hall Cooling Tower Replacement project, the Sackett Hall North parking lot (#3303) will be partially closed on Monday, November 6 to allow for crane activity. The closure will impact parking spaces on the east side of the lot, closest to Nash Hall. The south-west basement and south first floor entrances to Nash Hall will also be closed. The north-east entrance and the loading dock will remain open.
In addition, the walkway that runs along the west side of Nash Hall will also be closed. Pedestrians may detour around the area via walkways on the south, east and north sides of the building.
Other possible impacts include noise near the work site.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
As part of the Nash Hall Process Water Tower Replacement project, the process water loop at Nash Hall will be shut down on Thursday, November 9 and Friday, November 10.
This shutdown will only impact the building’s freezers and cold rooms. A portable freezer trailer will be provided for temporary storage of frozen materials.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
As part of the Nash Hall Cooling Tower Replacement project, the Sackett Hall North parking lot (#3303) will be partially closed on Monday, October 23 to allow for crane activity. The closure will impact parking spaces on the east side of the lot, closest to Nash Hall. The south-west basement and south first floor entrances to Nash Hall will also be closed. The north-east entrance and the loading dock will remain open. In addition, the walkway that runs along the west side of Nash Hall will also be closed. Pedestrians may detour around the area via walkways on the south, east and north sides of the building.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
As part of the Nash Hall Cooling Tower Replacement project, the Sackett Hall North parking lot (#3303) will be partially closed on Monday, October 23 to allow for crane activity. The closure will impact parking spaces on the east side of the lot, closest to Nash Hall. The south-west basement and south first floor entrances to Nash Hall will also be closed. The north-east entrance and the loading dock will remain open.
In addition, the walkway that runs along the west side of Nash Hall will also be closed. Pedestrians may detour around the area via walkways on the south, east and north sides of the building.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
As part of the Nash Hall Cooling Tower Replacement project, the Sacket Hall North parking lot (#3303) will be partially closed on Tuesday, October 17 and Monday, October 23 to allow for crane activity. The closure will impact parking spaces on the east side of the lot, closest to Nash Hall. The south-west basement and south first floor entrances to Nash Hall will also be closed. The north-east entrance and the loading dock will remain open.
In addition, the walkway that runs along the west side of Nash Hall will also be closed. Pedestrians may detour around the area via walkways on the south, east and north sides of the building.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
Nash AHU59 (air handler units) will be shut down to replace failed VFD drives for fan motors, AHU59 will be shutdown from 6am September 19th to 4pm September 20th. This will affect air flow to the labs on all floors and there will be very limited heating or cooling during this time. Exhaust fans will continue to run but fume hoods should not be used during this time and fume hood sashes should remain closed.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
The steam will be shut down in Cordley Hall East, Ag. Life Sciences Building, Linus Pauling, Nash Hall, West Greenhouse & Crop Sciences August 24, 2023 12:01 am – 8:00 am to repair distribution isolation valve gasket on the steam line along Campus Way (200 ft east of the north bound lane of SW 30th st.) This process affects hot water supply, heating, and all equipment that uses steam, building wide.
For questions or comments on this closure, contact Facilities Services at 541-737-2969.