For work related to the Cordley Hall Renewal Project, a planned power outage is scheduled from 5-7 a.m. on Thursday, August 18, 2022 for the following buildings on Oregon State University’s Corvallis campus:

  • Ballard Extension
  • Cordley Hall- East side
  • Gilmore Hall
  • Nash Hall
  • Withycombe Hall
  • Women’s Building

This is the rescheduled date for the planned power outage originally scheduled for August 8.

For questions or comments about this closure, contact Construction Manager Jason Lundy at 541-270-0193.

Power outage area map

For work related to the Cordley Hall Renewal Project, a planned power outage is scheduled for the following buildings on Oregon State University’s Corvallis campus:

  • Ballard Extension
  • Cordley Hall- East side
  • Gilmore Hall
  • Nash Hall
  • Withycombe Hall
  • Women’s Building

The planned power outage is scheduled from 5 a.m. to 7 a.m. on Monday, August 8, 2022. 

For questions or comments about this closure, contact Construction Manager Jason Lundy at 541-270-0193.

Planned power outage area map

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of July 4th

  • Reser Stadium
  • Merritt Truax Indoor Center
  • Magruder Hall Onan
  • Magruder Hall Generac

Week of July 11th

  • Cascade Hall
  • Dryden Hall
  • Lab Animal Resources Center
  • George W. Peavy Forest Science Center
  • Richardson Hall

Week of July 18th

  • Energy Center
  • Precision Agricultural Systems Center
  • RAIL

Saturday July 23rd

  • Nash Hall & Linus Pauling Science Center
  • Agricultural & Life Sciences Building

Week of July 25th

  • Hallie E. Ford Center
  • Kelly Engineering Center
  • Johnson Hall
  • Plageman Student Health Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

_____________________________

Facilities Services

University Facilities, Infrastructure & Operations

Oregon State University

830 SW 35th Street | Corvallis, OR 97331 | 541-737-2969

Due to construction activities related to chilled water piping integration in multiple buildings, a chilled water loop shutdown is scheduled starting on Monday, January 17, 2022 through Friday, January 21, 2022. In the event the work is completed ahead of schedule, services will be restored sooner. The following buildings are included in the shutdown: Nash Hall, the Agricultural & Life Sciences Building, Cordley Hall and the Burt Complex.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193 or Project Manager Dustin Sievers at 541-760-6240.

Shutdown has been extended until 1/25/22

As part of the Nash Hall Elevator project, the southwest elevator in Nash Hall will be out of service starting on Monday, Aug. 9 through Thursday, Aug. 12, 2021. The northeast elevator in Nash Hall will remain in service during this work. Work includes code-required modifications to fire sprinkler heads and associated electrical systems, which necessitates the temporary shutdown of the water to the fire suppression system and temporary disabling of associated alarms. A final elevator inspection is scheduled for Wednesday, Aug. 11, 2021. 

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of July 5th

  • Reser Stadium
  • Merritt Truax Indoor Center
  • Magruder Hall Onan
  • Magruder Hall Generac
  • Dryden Hall

Week of July 12th

  • Cascade Hall
  • Lab Animal Resources Center
  • George W. Peavy Forest Science Center
  • Richardson Hall

Week of July 19th

  • Energy Center
  • Precision Agricultural Systems Center
  • RAIL
  • Austin Hall
  • Learning Innovation Center

Saturday July 24th

  • Nash Hall & Linus Pauling Science Center
  • Agricultural & Life Sciences Building

Week of July 26th

  • Hallie E. Ford Center
  • Kelly Engineering Center
  • Johnson Hall
  • Plageman Student Health Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of the Nash Hall Elevator project, work is scheduled to modify four sprinkler heads. This requires a temporary shutdown of the water to the fire suppression system as well as temporary disabling of associated alarms. Work is scheduled to take place on the morning of Monday, April 26, 2021. This work does not impact other building utilities.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

As part of the Nash Hall Elevator project, a crane pick of elevator equipment is scheduled at Nash Hall, and in the building’s loading dock area and around the access road south of building. The Sackett North Lot (lot #3303) areas around Nash Hall will be impacted. Work is scheduled for Thursday, April 8, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall crane work area map

UPDATED: As part of the Nash Hall Elevator project, a sprinkler head needs to be removed, which requires the temporary shutdown of the water to that system as well as temporarily disabling the associated alarms at Nash Hall. Work is scheduled to take place all morning on Friday, April 9, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map