As part of the Withycombe Hall Renovation project, SW Campus Way will be closed between SW 30th St. and the Agricultural & Life Sciences Building from Monday, December 11 through Saturday, January 6. Emergency access and pre-arranged access to the East Greenhouses will be maintained during this closure.

The north sidewalk in this section of Campus Way will be closed. The south sidewalk and the south side of the brick walkway near ALS will remain open for pedestrians.

The map shows a street and sidewalk closure on SW Campus Way between SW 30th St. and the Agriculture and Life Sciences Building. The north sidewalk in the construction zone is marked as closed. A pedestrian detour is marked along the south sidewalk and the south side of the brick walkway near the Agriculture and Life Sciences Building.

For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.

As part of the Student Legacy Park Resurfacing project, construction activity may create minor delays for pedestrians along the sidewalk west of Dixon Recreation Center. The work will take place on Friday, December 8 from 12 – 4 P.M. Several parking spaces on the east side of SW 26th St. will be taped off for equipment staging. Work crews will be moving between the fenced construction area around the sand volleyball courts and a cement mixer parked on 26th St. Impacts to pedestrians are expected to be minimal.

In addition, a second work site will be active along the south sidewalk on SW Intramural Lane, across from Poling Hall. Workers in the area will be pouring concrete near the basketball court. Impacts to pedestrians are expected to be minimal.

The map shows a work area with construction fencing along the sidewalk west of Dixon Recreation Center on SW 26th St. The sidewalk is marked as open.  The location of a concrete mixer is marked in the parking spaces bordering the sidewalk on 26th St.

The map shows the location of a concrete mixer and a work area on SW Intramural Lane across from Poling Hall. The work area is located on the sidewalk just north of the basketball court at Student Legacy  Park.

For questions or comments on this closure, contact Construction Manager Scylise Little.