Facilities will be testing the newly installed transfer switch on January 4th, 2022  at 5am. There will be brief disruptions in power, approximately 30 seconds, on the red generator outlets and some emergency lighting while power is transferred to the generator and back. Testing should be completed by 8am. There will be no disruption to normal non-generator protected power in the building.

Parts of the building could see some airflow fluctuations during the testing. For questions or comments on this closure contact Facilities Services at 541-737-2969

Print Friendly, PDF & Email

Comments are closed.