Update: Repairs are scheduled for 12/20/22

Due to a failed component in the heat exchanger, the south end of Magruder Hall on both the 1st and 2nd floors will be experiencing cooler-than-normal temperatures. This will affect the heating for the South end of the building as well as domestic hot water. A restoral date is unknown at this time. Updates will be provided when they are available. 

For questions or comments on this notice contact, Andy Gray at 541-737-2969.

Notice: Domestic Water Shutdown in Rogers Hall 

Effective Date(s): December 14, 2022, 6:00 am – December 15, 2022, 6:00 pm.

The water will be shut down in Rogers Hall December 14, 2022, from 6:00 am to December 15, 2022 6:00 pm to remove and install new backflows. This will affect the domestic water building wide.

For questions or comments on this shutdown contact, Facilities Services at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

As part of the Community Hall Slope project, the walkway south of the pharmacy building will be closed to allow for railing installation.  ADA parking spots in the Furman Hall/South Pharmacy parking lot will also be unavailable during this time. However, ADA access to buildings will be maintained.

Noise impacts include cutting and jackhammering concrete.

For questions or comments on this closure, contact Construction Project Manager Scott Bond at 541-974-2520.

As part of the Fairbanks Hall renovation project, the parking lot west of Fairbanks Hall will be closed for Winter Break to allow for scheduled contractor work to be executed efficiently.

Spaces with EV stations and ADA spaces located in this lot will be offline for use.

For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.

**Update: Power has been restored, please call or email Facilities Services if you notice areas without power or if there are issues with equipment not resetting.**

Portions of Gleeson Hall have recently experienced a power outage due to a failed breaker panel. Currently, most fume hoods and the elevator are without power. At this time, there is no estimate for restoral. Fume hoods should not be used during this time, and sashes should remain down. Additional information will be sent out when it is available.

Email Facilities Services if you notice other problems or areas without power.

For questions or comments on this shutdown, contact Scott Drahn  at 541-737-8313.

Please forward this notice to anyone who would benefit from this information.

As part of the Fairbanks Hall Renovation Project, the parking lot west of Fairbanks Hall and the bike racks north of Fairbanks Hall will be closed for storm drain work, which includes VacEx truck work. VacEx truck work can be noisy. Work is scheduled to take place between 7 a.m. and 4 p.m. on Friday, November 11, 2022 (view map).

For questions or comments on this closure, contact Project Manager Amy Keene at 541-737-5312.

11/10/22 @ 11:15am Operation to the freight elevator has been restored.

The freight elevator at Linus Pauling Science Center is currently shut down for emergency repairs. A restoral date is unknown at this time, replacement parts are on order. Updates will be provided when they are available. For questions contact Facilities Services at 737-2969.