From Monday, September 12, 2022 through Tuesday, September 13, 2022, contractors will be onsite at George W. Peavy Forest Science Center replacing a pane of glass on the third floor of the building. A 60-foot lift will be onsite and the sidewalk located on the east side of the building in the small arboretum area will be roped off. Pedestrians can access the building from the north entrance.

Peavy Forest Science Center
Print Friendly, PDF & Email

Comments are closed.