The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences July 11, 2025 6:30 am – 11:00 am. Building occupants may notice slight pressure & air flow changes throughout the building.
For questions or comments on this closure contact Richard Olsen at 541-737-7025.
In addition to locations listed in the previous notification, ADA ramp work will also take place at the intersection of Western Blvd. and Stadium Ave. this week, near The LaSells Stewart Center. There will be single lane closures on Western Blvd. in this area and bicyclists will be directed to ride with traffic.
For questions or comments on this closure, contact Project Manager Josh Bjornstedt.
The water line replacement project led by the city of Corvallis will continue June 30-July 3, 2025 on SW 35th St. and Western Blvd. No road or intersection closures are expected. Please see potential impacts below.
Sidewalk ADA ramp work will continue at the following intersections:
SW Deon Dr. & Western Blvd.
SW Sagebrush Dr. & SW 35th St.
SW 35th St. & Western Blvd
Flaggers will be controlling traffic at the 35th St./Western Blvd. intersection at times.
Lane closures may occur to accommodate the work zones.
Bike lanes may be closed and bicyclists will be directed to ride with traffic.
Pedestrians may be detoured at times to avoid work zones.
For questions or comments on this closure, contact Project Manager Josh Bjornstedt.
As part of the Washington Way Improvement project, a section of SW Washington Way will be closed between SW 15th and SW 26th St. starting Monday, June 30 – Tuesday, July 1. The intersections at SW 17th St. and SW Benton Place will be closed. The closure is necessary to complete pavement striping work in the area.
The crosswalks at Benton Place and SW 17th St. will be closed. The crosswalk at SW 15th St. and the mid-block crossing between Goss Stadium and Dixon Recreation Center will be available. The sidewalks on the north and south sides of Washington Way will remain open.
For questions or comments on this closure, contact Project Manager Eric Smith at (541) 409-5037.
The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences July 2, 2025 5:30 am – 11:00 am. Building occupants may notice slight pressure & air flow changes throughout the building.
For questions or comments on this closure contact Richard Olsen at 541-737-7025.
Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators. Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing. Each generator will be refueled after testing.
Week of July 7th
Magruder Hall Onan
Magruder Hall Generac
Lab Animal Resources Center
Dryden Hall
Week of July 14th
George W. Peavy Forest Science Center
Richardson Hall
Energy Center
Precision Agriculture Systems Center
Week of July 21st
RAIL
Austin Hall & Learning Innovation Classroom Building
Hallie E. Ford Center
Milam Hall
Saturday July 26th
Nash Hall & Linus Pauling Science Center
Agricultural & Life Sciences Building
Week of July 28th
Burt Hall
Dearborn Hall
Milne Computer Center
The Valley Library
Week of July 29th
Pharmacy
Western Shops
For questions or comments on this notice contact, Brandon Holden at 541-737-8313.
The water line replacement project led by the city of Corvallis will continue this week on SW 35th St. and Western Blvd. No road or intersection closures are expected. Please see potential impacts below.
Sidewalk ADA ramp work will continue at the following intersections:
SW Deon Dr. & Western Blvd.
SW Ivy Pl. & Western Blvd.
SW Sagebrush Dr. & SW 35th St.
SW 35th St. & Western Blvd
Flaggers will be controlling traffic at the 35th St./Western Blvd. intersection at times.
Lane closures may occur to accommodate the work zones.
Bike lanes may be closed and bicyclists will be directed to ride with traffic.
Pedestrians may be detoured at times to avoid work zones.
For questions or comments on this closure, contact Project Manager Josh Bjornstedt.
A vacuum truck will be operating near Gilkey Hall as part of a project to install a new water main. This project will begin Monday, June 23 and continue through Tuesday, July 15. This will increase construction noise around Gilkey Hall and the surrounding area.
For questions or comments on this closure, contact Project Manager Judd Mentzer at (541) 285-5717.
Beginning on Monday, June 23, parking lots across campus will be temporarily closed for repair and maintenance. The closures will occur in phases starting Monday, June 23 – Thursday, July 3.
ALL vehicles must be removed from these lots prior to the closure start date (see schedule and map below).
Please see below for specific dates and locations:
As part of construction activity at Fairbanks Hall, the walkway on the west side of the building will be closed starting on Monday, June 16 through Friday, June 20. A small section of the parking lot will also be closed. The west porch entry to Fairbanks Hall will be closed. The west side ADA ramp and west basement doors will remain open along with the main entrance on the east side of the building.
For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.