The Richardson Hall chiller and chilled water system will be shut down immediately for emergency repairs. Building occupants will notice warmer than normal air temperatures during this time. This will not affect temperatures in the server rooms. Estimated restoral date is August 25th.
For questions or comments on this closure contact Sean Olsen at 541-737-2969.
Category Archives: Uncategorized
8/22-8/26: Scheduled RO/DI Water Shutdown Richardson Hall
RO/DI water will be shut down to Richardson Hall starting August 22th through August 26th to allow installation of a new RO/DI water system. During this week the old system will be removed and replaced and new electrical and plumbing connections will be made.
For questions or comments on this notice contact Dan Wombacher 541-737-2969.
8/10/22: Agricultural & Life Sciences Bldg. – Generator Transfer Switch Testing
Scheduled: Agricultural & Life Sciences Bldg. – Generator Transfer Switch Testing
Effective Date(s): August 10, 2022, 6:30 am – 7:30 am.
To ensure recent repairs to the transfer switch were successful, power to all 208 and 120v red emergency outlets will be briefly interrupted for testing on August 10, 2022. Power interruptions should only occur when the switch is turned on and then turned off a short amount of time later.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
8/5/2022-June 2024: North/south sidewalk closure on east side of Cordley Hall
As part of the Cordley Hall Renewal Project, the north/south sidewalk on the east side of Cordley Hall will be closed due to construction activities from Friday, August 5, 2022 until June 2024.
This sidewalk is between Cordley Hall, Bates Hall and the Hallie E. Ford Center. The closure is between SW Campus Way and SW Orchard Ave.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

7/28/22: Linus Pauling Science Center Supply Fan Showdown
One of the Linus Pauling Science Center building supply fans will be shut down to replace several failed fan motors. Building occupants may notice some air pressure fluctuations, fume hoods will remain operational.
For questions or comments on this closure, contact Matt Zink at 541-737-2969.
Please forward this notice to anyone who would benefit from this information.
6/14/22: Linus Pauling Science Center Fume Hood Repairs
Linus Pauling Science Center fume hood exhaust fans will have scheduled repairs Tuesday 6/14/2022, from 6 am to 5 pm. Building occupants may notice some pressure fluctuations however, fume hoods will remain operational.
For questions or comments on this closure, contact Richard Olsen at 541-737-7025.
6/6/22-6/8/22 8a -3:30p: Scheduled: Chilled Water Shutdown Richardson Hall
Chilled water will be shut down to Richardson Hall starting June 6th at 8 am until June 8th at 3:30 pm to perform repairs on the building chiller. Building occupants may notice warmer than normal air temperature
For questions or comments on this closure contact Sean Olsen at 541-737-2969.
5/11 – 5/23/2022: Closure of southbound SW 26th St. between Campus Way & Jefferson Way
As part of the 2022 Street Safety Maintenance Project, the southbound lane of SW 26th Street between SW Campus Way and SW Jefferson Way will be closed for road improvements from May 11 through May 23rd. SW 26th Street will be open to northbound traffic only.
For questions or comments on this closure, contact Project Manager Aaron Amoth at 541-737-5064.

5/10/2022: Short-term flagging operations along SW 26th and SW 30 Sts., SW Washington Way
As part of the 2022 Street Safety Maintenance Project, short-term flagging operations will take place on SW 26th street, SW 30th Street and SW Washington Way to allow for contractor saw-cutting concrete and asphalt streets for repairs. Work will begin at 7:30 a.m.

For questions or comments on this closure, contact Project Manager Aaron Amoth at 541-737-5064.
5/6-6/13/2022: Planned sidewalk closure along north side of SW Washington Way
For work related to the Washington Way Improvement Project, a planned sidewalk closure along the north side of SW Washington Way is scheduled to start at 8 a.m. on Friday, May 6, 2022 through 5 p.m. on Monday, June 13, 2022. Pacific Power will be on site performing work related to the project.
For questions or comments on this closure, contact Infrastructure Project Manager Aaron Amoth at 541-737-5064.