As part of the Milam Hall re-roofing project, a lift will be set up adjacent to Milam Hall for the roof design team to gain access to the roof starting at 9 a.m. on Thursday, April 15, 2021. Work will continue through Friday, April 16, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Milam Hall area map

As part of the Campus Operations building project, the Western Building parking lot will be fully closed for paving. Paving work is scheduled to start on Thursday, April 15 through Sunday, April 18, 2021. If you are planning to come to the Western Building on these days, you will need to park in another parking lot. If you have fleet vehicles in the Western Building lot, they will need to be moved by end of day on Wednesday, April 14, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building parking lot area map

As part of the Nash Hall Elevator project, a crane pick of elevator equipment is scheduled at Nash Hall, and in the building’s loading dock area and around the access road south of building. The Sackett North Lot (lot #3303) areas around Nash Hall will be impacted. Work is scheduled for Thursday, April 8, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall crane work area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building lot for grading and paving work. Partial lot closures are scheduled to start on Monday, April 5 through Friday, April 23, 2021. Half of the parking lot will remain open at all times. Please note, paving work is weather dependent and future updates to the schedule may follow this notice.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building lot area map

Geotechnical drilling and boring work is scheduled to occur at five locations in the West Greenhouse area. Work will take place near a section of Campus Way, the West Greenhouse parking lot (lot #3320), and on the west and east sides of the Seed Lab from 7 a.m. to 5 p.m., on Wednesday, March 31, 2021.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

West Greenhouse area map with boring holes outlined in red

As part of the North District Utility Plant (NDUP) project, work to provide electrical service to the NDUP, located along NW Orchard Avenue, is scheduled to start on Monday, March 29, 2021 through Friday, April 16, 2021. Work could create possible extended construction activity and noise, and/or noise during normal business hours. A roadway closure for SW 26th Street between Campus Way and Monroe Avenue and a partial parking lot closure for the Bates Hall lot (lot #3313) are also scheduled as part of the work.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

North District Utility Plant work site map

The Orchard Ave. House, located at 3036 NW Orchard Avenue, is scheduled for demolition. Demolition work is scheduled to start on Monday, March 29 through Tuesday, March 30, 2021. Work will occur on site from 7 a.m. to 5 p.m., daily. Right of Way permits have been obtained from the City of Corvallis and the City of Corvallis has been notified about the demolition. The Wiegand Hall parking lot (lot #3330) as well as the alleyway to NW Orchard Avenue will be impacted while demolition work occurs.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Orchard Ave. House demolition area map

For work related to the Poling Hall Window Replacement project, there will be partial road and sidewalk closures near Poling Hall from 8 a.m. to 5 p.m., daily, starting on Monday, March 22, 2021 through Friday, March 26, 2021. The west sidewalk at SW Weatherford Place will be partially obstructed by lifts on Monday, March 22, 2021, while teams measure window dimensions for an upcoming project. Lifts will be partially obstructing the north lane of SW Intramural Lane to facilitate staging and site access throughout the week.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Poling Hall project area map

UPDATED: As part of the Nash Hall Elevator project, a sprinkler head needs to be removed, which requires the temporary shutdown of the water to that system as well as temporarily disabling the associated alarms at Nash Hall. Work is scheduled to take place all morning on Friday, April 9, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

As part of a construction project at the RAIL 244 facility, this is an informational campus-wide notification to inform pedestrian path users about the potential for increased vehicle traffic along Campus Way, between SW 35th Street and SW 53rd Street. Vehicles will be traveling to and from the RAIL facility and the Building 244 construction site. The general contractor for the project will post signs at key points for the duration of the project.

For questions or comments on this closure, please contact Construction Manager Amy Keene at 541-214-1038.

Campus Way area map