As part of the Owen Hall Renovation Project, a temporary elevator shutdown is scheduled from 7 to 9 a.m. on Thursday, October 14, 2021 to upgrade the fire alarm system in the building. The first and second floors of Owen Hall can be accessed by using Kearney Hall and the sky bridge.

For questions or comments on the elevator shutdown, contact Project Manager John Doty at 541-740-8302.

A temporary sidewalk closure in the area around the Owen Hall loading dock is scheduled from 7 a.m. to 3:30 p.m. daily starting Thursday, October 14 through Friday, October 15, 2021. A crew will be working on the roof of the building to install antenna locations for a DAS system.

For questions or comments on the DAS antenna work and temporary sidewalk closure, contact Project Manager David Amundson at 541-737-2760.

Owen Hall area map

As part of the 2021-22 Street Resurfacing Project along NW Harrison Blvd, changes to access on NW Harrison Boulevard will remain in effect as follows:

  • October 1-12, 2021 – Harrison Blvd day time closure, open overnight (Circle to 29th), and open on the weekends. The existing detour that utilizes 29th, and Grant will be expanded to include Witham and Circle. Detours will be signed.
  • NW Harrison Blvd will be open all day on Saturday, October 2, 2021 for the OSU home football game.
  • 35th Street at Harrison Blvd will be closed during the daytime to allow the grinding and paving to occur. A traffic detour for the closure of 35th Street at Harrison will be Western to 15th to Harrison.

This project is managed by the city of Corvallis. For questions or comments on this closure, contact Project Manager Josh Bjornstedt

The Fairbanks Hall Renovation Project is now in construction. Due to forecasted windy weather and Fairbanks Hall re-roofing work overhead, the sidewalk between Fairbanks Hall and the Women’s Building will be closed temporarily for safety reasons on Friday September 24, 2021. The south door at the Women’s Building will have signage directing people to use a different door for this short duration. The sidewalk will re-open to pedestrians at 5 p.m. on Friday, September 24, 2021.

For questions or comments on this closure, contact Construction Manager Amy Keene at 541-214-1038.

Fairbanks Hall sidewalk closure area map

For work related to the Arts and Education Complex project, a planned power shutdown for the old heat plant is scheduled between 8 a.m. and 4 p.m. on Tuesday, September 14, 2021 due to new electrical service being added to the building. A backup generator for the steam tunnel will be on during the shutdown.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Old heat plant area map

As part of the North District Utility Plant (NDUP) and Cordley Hall Renewal projects, crews will be performing chiller start up procedures and functional testing on three new chillers within the North District Utility Plant. Functional testing will include integration with the existing chilled water loop beginning at 7 a.m. on Monday, October 11, 2021 through 5 p.m. on Friday, October 15, 2021. The Agricultural & Life Sciences Building, Nash Hall, Cordley Hall, Wilkinson Hall and the Burt Complex could see chilled water flow and temperature fluctuations as a result of the testing procedures. The NDUP is located along NW Orchard Avenue next to Cordley Hall.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193 or Project Manager Dustin Sievers at 541-760-6240.

North District Utility Plant area map

The Fairbanks Hall Renovation Project is now in construction. Due to truck delivery activity, to avoid trucks attempting to stage and offload directly on Jefferson Street, safety concerns, and clearances required in the construction area, the ADA parking spaces located on the west side of the Fairbanks Hall parking lot (lot #3301) will be offline for use starting Friday, September 10, 2021 (view map). Click here to view a map of nearby ADA parking spaces. You can expect increased activities at the building site and an increase in truck traffic on Jefferson Way, to and from 35th Street.

For questions or comments on this closure, contact construction manager Amy Keene at 541-214-1038. Please contact Transportation Services at 541-737-2583 for additional ADA parking assistance, if needed.

Parking lot #3301 area map

Map of nearby ADA parking spaces

Map of nearby ADA parking space

For work related to the Arts and Education Complex project, a temporary water shutdown is scheduled for Tuesday, September 14, 2021 so that the City of Corvallis can work on the city waterline. McAlexander Fieldhouse and the old heat plant will be without water from 8 a.m. to 4 p.m. that day.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Temporary water shutdown area map

As part of the Community Hall Slope Project, tree removal work in the project area is scheduled to start on Wednesday, September 1, 2021 through Friday, September 3, 2021. Additional work associated with the project is scheduled to continue on Tuesday, September 7, 2021, starting at the east side of Furman Hall.

Oregon State University began work in early July 2021 to update the area shown in this map image to provide access through this portion of OSU’s Corvallis campus for all people. ADA improvements related to the project will also require reconstruction of building entrances to Gladys Valley, the Pharmacy Building and Joyce Collin Furman Hall. There will be an open entrance to each building at all times. 

We will work to accommodate the needs of users working within the project area, but there will be disruptions to many day-to-day activities. If you have specific concerns regarding this project and how it may impact you or your work, please contact with Project Manager Lindsey Austin at 541-990-7720, to work through any issues.

Community Hall Slope Project work area

As part of the Graf Hall Renovation Project, the Monroe Ave. and 16th Street parking lot (lot #3221), located south of Graf Hall, will be closed for construction starting on Monday, August 30, 2021 through Tuesday, September 21, 2021. The accessible spaces at the east end of the lot adjacent to Merryfield Hall will remain open.

For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.

Lot #3221 closure area map