A crane will be working in the walkway area between the Agricultural and Life Sciences Building and Nash Hall starting Tuesday, December 17 – Thursday, December 19. The crane will be lifting equipment onto the roof of the ALS Building. A section of SW Campus Way between Nash Hall and the ALS Building will be closed. The walkway area between the two buildings will be closed.

The south sidewalk in this section of Campus Way will be closed. The north sidewalk will remain open. The loading zone parking spaces outside of Nash Hall will be closed.

Both buildings will remain open during the crane activity. The west and south entrances to Nash Hall will be open. Signage on the east side of the ALS building will direct pedestrians through ALS to the east side entrance of Nash Hall.

Other possible impacts include noise near the work site.

A map showing a crane placement and road closure on SW Campus Way between the Agricultural and Life Sciences Building and Nash Hall.


For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.

As part of the Bloss Hall Renovation project, a fenced work zone will close SW Stadium Ave. just west of Bloss Hall and close a section of parking spaces between Bloss Hall and CH2M HILL Alumni Center (Bloss Hall West Lot). The closure will be in effect starting Monday, December 16 through Monday, January 20.

Vehicles may detour through the Bloss Hall West parking lot or access SW Stadium Ave. from SW 26th St.

A map showing a street and parking space closure on SW Stadium Ave.,  west of Bloss Hall.

Other potential impacts include noise near the work zone.

For questions or comments on this closure, contact Construction Manager Josh Walsh at (541) 737-0927.