As part of the Fairbanks Hall Renovation project, the Fairbanks Hall West parking lot will be closed starting Thursday, March 21 through Friday, March 29 for gutter work on the building. All ADA parking spaces in the parking lot will be closed.

The sidewalks and walkways bordering Fairbanks Hall on all sides of the building will be closed in phases to allow for equipment to be maneuvered around the area. These closures will be intermittent. This includes the walkways on the north and west sides of Fairbanks Hall, the west sidewalk on 26th St.  and the north sidewalk on Jefferson Way.

Staff will be present in the area to help pedestrians navigate around the sidewalk closures. Pedestrians may use the east sidewalk on 26th St., the south sidewalk on Jefferson Way or the walkway west of the Asian & Pacific Cultural Center as alternate routes.

Access to the parking lot will be available for trash and recycling pickup.

The map shows a parking lot and sidewalk closure at Fairbanks Hall. The sidewalks and walkways bordering Fairbanks Hall on all sides of the building, including along SW 26th St. and SW Jefferson Way, are marked as closed. The parking lot west of the building is marked as closed.

For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.