As part of the Summer 2023 Parking Lot Renewal Project, the Washington Avenue NW parking lot (B1 lot east of SW 15th Street, between SW Washington Ave. and SW Adams Ave.) will be closed on Thursday, July 6 and Friday, July 7.
Other possible impacts include noise and dust near the work site.
For questions or comments on this closure, contact Kristie Liddle at (541) 737-9618.
As part of the Summer 2023 Parking Lot Renewal Project, the Madison Ave. Co-op parking lot (B1 lot east of Oxford House and Champinefu Lodge, between SW 9th and SW 11th Streets) will be closed on Thursday, July 6 and Friday, July 7.
Other possible impacts include noise and dust near the work site.
For questions or comments on this closure, contact Transportation Services at (541) 737-2583.
As part of the Kelley District Utility Plant project, the chilled water cooling system will be temporarily shut down in Kelley Engineering Center and Johnson Hall on Thursday, July 6 from 5 A.M. to 1 P.M to allow for piping work. The chilled water system controls the air conditioning in the impacted buildings.
The buildings will experience higher than normal temperatures, but the server rooms will not be impacted by this shutdown. ADA access will be maintained during this project.
Other possible impacts include noise and dust near the work site.
For questions or comments on this closure, contact Construction Manager Justin Fuszek (541) 740-5260.
As part of the 2023 Street Safety Project, SW Campus Way between SW 14th St. and SW Pioneer Place will be closed on Thursday, July 6 from 7 A.M. to 1 P.M., except to allow traffic to exit eastbound from Pioneer Place. Workers in the area will be directing traffic, moving equipment and allowing drivers to exit from Pioneer Place as necessary. The westbound lane from 14th St to Pioneer Place will be closed to all traffic. Vehicles needing access to Pioneer Place may detour around the work area via SW Jefferson Way and enter from the eastbound lane on Campus Way. Please see detour map for reference.
In addition, the dedicated parking spaces for the School of Civil and Construction Engineering will be closed for the duration of the project.
Sidewalks will remain open for pedestrians. Other possible impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.