As part of the Community Hall Slope project, the walkway on the south side of the Pharmacy building and the ADA parking spots in the south Pharmacy/Furman parking lot will be closed to allow for handrail installation. Garbage trucks will have access to the trash enclosure. Alternative pedestrian access will be available and ADA access to buildings will be maintained.
Other possible impacts include minor noise from drilling concrete.
For questions or comments on this closure, contact Construction Manager Scott Bond at (541) 974-2520 .