As part of the Whyte Track and Field Center project, the parking lot adjacent to the track and the softball stadium will be closed from 2/20/23 – 8/15/23, except for special events. Pedestrians may access the track via an alternate route between the softball complex and the soccer field. Other possible impacts include noise, dust and mud near the construction site.

A map shows a parking lot closure at Whyte Track and Field Center. An alternate pedestrian route is shown along the north side of the softball complex.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.


As part of the New West Greenhouse project, the West Greenhouse Complex parking lot will be permanently closed. Pedestrian access to the north sidewalk along Campus Way between 30th & 35th Streets will be limited throughout the duration of the project.

For questions or comments on this closure, contact Construction Manager John Doty at (541) 740-8302

As part of the Fairbanks Hall renovation project, the parking lot west of Fairbanks Hall will be closed for Winter Break to allow for scheduled contractor work to be executed efficiently.

Spaces with EV stations and ADA spaces located in this lot will be offline for use.

For questions or comments on this closure, contact Project Manager Amy Keene at (541) 737-5312.

As part of the Fairbanks Hall Renovation Project, the parking lot west of Fairbanks Hall and the bike racks north of Fairbanks Hall will be closed for storm drain work, which includes VacEx truck work. VacEx truck work can be noisy. Work is scheduled to take place between 7 a.m. and 4 p.m. on Friday, November 11, 2022 (view map).

For questions or comments on this closure, contact Project Manager Amy Keene at 541-737-5312.

For work related to the Withycombe Hall renovation project, a closure is scheduled for parking lot #3316 (Orchard Ave. South Lot), located just north of Withycombe Hall along Orchard Ave., to allow for a construction trailer move in. The closure is scheduled from 6 a.m. to 5 p.m. on Wednesday, September 14, 2022.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Withycombe Hall area map

For work related to the 2022 Summer Parking Lot Renewal Project, multiple parking lot and roadway closures along SW Intramural Lane are scheduled.

  • The Intramural lot (lot #3294) will be closed from August 18-September 9, 2022.
  • The N 16th St East lot (lot #3224) will be closed from August 18-August 31, 2022.
  • The N 16th St West lot (lot #3223) will be closed from August 18-September 14, 2022.
  • SW Intramural Lane will be closed between SW 30th Street and SW 26th Street for the duration of the project.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Amoth at 541-737-5064.

Summer Parking Lot Renewal Project area map

The following parking lots will be closed for summer maintenance, repairs and painting from Wednesday, June 29, 2022 through Thursday, July 7, 2022. 

Slurry Closures

June 29 – July 1, All Day

July 5 – 7, All Day 

Crack Fill, Seal and Painting schedule

June 29 – All Day 

June 30 – All Day 

July 1 – All Day 

July 5 – All Day 

July 6 – 8, All Day 

For questions or comments on the closure or about where to park, please contact Transportation Services at 541-737-2583. 

For questions about this project, please contact Field Supervisor Kristie Liddle at 541-737-9618.

The OSU Parking Garage will be closed for extensive cleaning from Sunday, June 19, 2022 through Friday, July 22, 2022. Surrounding sidewalks will also be closed to facilitate the project.

For questions or comments on the closure or about where to park, please contact Transportation Services at 541-737-2583. 

For questions about this project, please contact Field Supervisor Kristie Liddle at 541-737-9618.

OSU Parking Garage area map