Convergint will be conducting annual fire alarm & sprinkler testing. Testing will take place in the buildings listed below. The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building. Signage will be posted on exterior doors while testing is being conducted.

July 8th  

  • Cordley Hall

July 9th

  • Bates Hall
  • Hallie E. Ford Center

July 10th

  • Wilkinson Hall
  • Ballard Extension Hall
  • Plageman

July 11th

  • Johnson Hall
  • Kelley Engineering Center

July 12th  

  • Bexell Hall
  • Weniger Hall
  • Gleeson Hall

For questions or comments on this notice contact,  Alarm Shop at 541-737-2969.

As part of the Kelley District Utility Plant project, Kelley Engineering Center will be CLOSED on June 22 from 7:00 AM until 3:30 PMThe water main to the building is being modified for the Kelley District Utility Plant. The building will be locked and signs will be posted on exterior doors indicating that the building is closed.  

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260. 

As part of the Kelley District Utility Plant project, a section of the walkway between Kelley Engineering Center and Plageman Hall will be closed on Friday, June 21 to allow for tree removal work. The south entrance to Plageman Hall will be closed.

Other possible impacts include noise and dust near the work site.

A map showing a walkway closure between Kelley Engineering Center and Plageman Hall, just west of SW Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the Kelley District Utility Plant project, the walkway between Kelley Engineering Center and Plageman Hall, just west of SW Memorial Place, will be closed on Wednesday, June 12. Bike racks and lockers in the area will remain open. All entrances to Kelley and Plageman will remain open.

A map showing a walkway closure between Kelley Engineering Center and Plageman Hall, just west of SW Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, SW Campus Way between SW 26th St. and SW Memorial Place will be closed starting Wednesday, May 29 through Monday, June 10.  The closure is necessary to allow for crane activity related to the project. Unlike recent, intermittent closures related to the project, this will be a continuous closure of Campus Way.

The Kelley Engineering Center south entrance will also be closed.

A map showing a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

A map showing a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

This is an update to a previous notification.

The crane work on SW Memorial Place near Kelley Engineering Center has been completed and the street, parking spaces and sidewalk will reopen on Tuesday, May 21 at 4 P.M.  

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, SW Memorial Place will be closed between Kelley Engineering Center and Plageman Hall from Tuesday, May 21 through Wednesday, May 22 to allow for crane activity.

The street parking spaces in this section of Memorial Place will also be closed.

The west sidewalk on Memorial Place will be closed from Campus Way to Plageman Hall. The east sidewalk will remain open as a detour.

The Kelley Engineering center east entrance will remain open.

Other possible impacts include noise near the work site.

A map of SW Memorial Place showing a road closure between Kelley Engineering Center and Plageman Student Health Center. The west sidewalk is marked as closed from SW Campus Way to Plageman Student Health Center. The east entrance to Kelley Engineering Center is marked as open.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, the sidewalk between Plageman Hall and Kelley Engineering Center will be closed on Tuesday, May 14. The south entrance to Plageman Hall and the bike shelter and lockers will remain open.

Other possible impacts include noise near the work site. 

An aerial view of Plageman Hall and Kelley Engineering Center with a sidewalk closure highlighted between the two buildings.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260. 

This is an update to previous notification.

SW Campus Way between 26th St. and Memorial Place will remain closed through Saturday, April 27 to allow completion of the current phase of construction. The road, sidewalk and bike lanes will then be reopened through Sunday, May 5th.

The south entrance of Kelley Engineering Center will remain closed.

Intermittent closures and construction activity in the area will resume on Monday, May 6th.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.