As part of the Research Way Lab Building renovation project, on Monday, May 4, 2020, the electrical sub-contractor, EC, will be shutting down the fire alarm panel from 7 a.m. to 12 p.m., to re-route the existing fire alarm to make room for the new panel. Andersen Construction will be providing fire watch throughout the building during this period. Occupants will be notified once the existing system is back online.

For questions or comments on this closure, contact Construction Manager Amy Keene at 541-214-1038 or Project Manager John Doty at 541-740-8302.

Map of Research Way Lab Building location

As part of the Research Way Lab Building renovation project, crane work will occur to get new HVAC equipment on the roof. The crane work at the west side of the building will interrupt the normal operations of SIGA as well as the construction activities of contractors inside the building each time the crane boom swings over the building. For the safety of all involved, there will not be anyone allowed in the building under or near each pick location. Andersen Construction will provide onsite personnel to clear the building before each pick. (This work does not affect the SE CEOAS space).

For questions or comments on this closure, contact Construction Manager Amy Keene at 541-214-1038.

Research Way Lab Building map

Steam will be isolated to Cascade Hall and Adams Hall on Friday April 24, 2020 at 3 p.m. to accommodate construction work on the system at Cascade Hall. The system will be returned to service on Monday, April 27, 2020 by 3 p.m. This will only affect building heat in a portion of the building supplied by steam heat.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

As part of the Fairbanks Hall Renovation project, the geotech company working on the project will be drilling test holes and there will be a drill rig on site. The site will be set up in two electric vehicle spaces on the west side of Fairbanks Hall.

For questions or comments on this closure, contact Construction Manager Amy Keene at (541) 214-1038 or Capital Construction Manager Lori Fulton at 541-737-4625.

Map of work near Fairbanks Hall, Oregon State University

Domestic water and fire line will be out of service from 8 a.m., Thursday, March 26 to 5 p.m., Sunday, March 29. Water will be turned on sooner if possible. The sidewalk and roadway will be closed from 7 a.m., Wednesday March 25 to 5 p.m., Sunday, March 29, 2020. Northbound traffic will be shifted around the work. Flaggers may be utilized if necessary.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.

Map of work zone along SW 26th Street outside of LaSells Stewart Center

The manholes along May Avenue will be repaired and the asphalt will be replaced between Arnold Dining Center and the Beth Ray Center for Academic Support. May Avenue will be completely closed to all traffic during this work on Monday, March 23 and Tuesday, March 24, 2020.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.

May Avenue closure map

Work is scheduled to take place along SW 30th Street and Washington Way for repairs associated with a campus steam vault. Southbound SW 30th Street will be closed from 6 a.m. on Monday, March 23 to 5 p.m. on Wednesday, March 25, and again from 6 a.m. on Monday, March 30 to 5 p.m. on Tuesday, March 31.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

As part of the LaSells Stewart Center fire line back flow replacement work, a planned sidewalk closure in front of the LaSells Stewart Center along SW 26th Street is scheduled to occur from 7 a.m. to 5 p.m., on Monday, March 9, 2020. Traffic will be shifted around the work area.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.

Map of sidewalk closure along SW 26th Street, Corvallis, Oregon