Pacific Power is scheduling a power outage to make immediate repairs to equipment in an underground vault outside student health. The outage will begin Sunday morning April 2, 2023 beginning at 5:00 am with an estimated completion time of 8 am.  Please see the list of impacted buildings below. These buildings will be closed to the public during the outage.

 Affected buildings:

  • Plageman Student Health Center
  • Weniger Hall

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to Sunday,  April 2nd. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. The building will not have network connectivity during this power outage, i.e. no wireless, wired internet or VoIP phone connectivity. Anything that relies on the network will not be functional.

The exhaust and supply air in Johnson Hall will be shut down for maintenance March 30, 8:00 am – 4:00 pm.  All fume hood exhaust will be shutdown, sashes should be kept closed. This will also affect heating/cooling of the lab spaces on the north side 2nd and  3rd floors of the building.

For questions or comments on this closure contact Facilities Services 541-737-2969.

The exhaust and supply air in Richardson Hall will be shut down for maintenance March 27, 7:00 am –  March 29, 4:00 pm.  All fume hood exhaust will be shutdown, sashes should be kept closed. This will also affect lab air and building heat throughout the building.

For questions or comments on this closure contact Facilities Services 541-737-2969.

The water and restrooms in The Valley Library will be shut down and closed in the entire building for emergency sewer repairs. This affects all toilets, sinks, drinking fountains and hot water heaters. A second notice will follow when services have been restored. 

For questions or comments on this closure contact Facilities Services at 541-737-2969.

A leak was discovered on the main water line leading into the Hattie Redmond Women and Gender Center. To prevent flooding and repair the line, the water was shut down for emergency repairs as of March 2, 2023, and will remain off until March 3 at 8 am. This shutdown will affect all water throughout the building.

For questions or comments on this closure contact Facilities Services at 541-737-2969.