The Energy Center will be shutting down the Corvallis campus steam distribution operations August 5, 2024 5:00 am – 11:00 am to correct primary distribution steam leaks and controls related repairs. This process affects hot water supply, heating, and all equipment that uses steam, campus wide. 

For questions or comments on this closure contact Les Walton at 541-737-4395.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing. 

Week of July 1st 

  • Cascade Hall 
  • Reser Stadium East 
  • Merritt Truax Indoor Center 
  • Magruder Hall Onan 
  • Magruder Hall Generac 

Week of July 8th 

  • Lab Animal Resources Center 
  • Dryden Hall 
  • George W. Peavy Forest Science Center 
  • Richardson Hall 

Week of July 15th 

  • Energy Center 
  • Precision Agriculture Systems Center 
  • RAIL 
  • Austin Hall & Learning Innovation Classroom Building 

Saturday July 20th 

  • Nash Hall & Linus Pauling Science Center 
  • Agricultural & Life Sciences Building 

Week of July 22nd 

  • Hallie E. Ford Center 
  • Milam Hall  
  • Burt Hall 
  • Dearborn Hall 

Week of July 29th 

  • Milne Computer Center 
  • The Valley Library 
  • Pharmacy 
  • Western Shops  

For questions or comments on this notice contact, Facilities Services at 541-737-2969. 

The air handlers will be shutdown in Magruder Hall on June 11 & 12, 2024 between 5:00 am – 10:30am for 45 minutes each to replace final filters and perform preventative maintenance on units. This will affect heat and cooling building wide and cause reduced airflow during this time.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing. 

Week of June 3rd  

  • Parking Garage 
  • Gill Coliseum 
  • Magruder MRI Trailer 
  • Radiation Center 

Week of June 10th  

  • Environmental Health & Safety Annex 
  • James E. Oldfield Animal Teaching Facility 
  • Crop Science Building 
  • Strand Agricultural Hall 

Week of June 17th  

  • Vacuum Vault 
  • Goss Stadium 
  • Patricia Valian Reser Center for Creative Arts 
  • Fairbanks Hall 
  • Health Center 

Week of June 24th  

  • Salmon Disease Lab #2 
  • Research Lab #1 
  • Portable Generator #1 
  • Portable Generator #2 
  • Portable Generator #5 

For questions or comments on this notice contact, Facilities Services at 541-737-2969. 

Convergint be conducting fire alarm testing in Dryden Hall and Hovland Hall May 9, 2024 between 10:00 am -3:30 pm.  The testing for the alarm will be around 10:00 am with the remainder of the devices commencing after that.  The testing will be brief and include both sounding of alarms and strobes.

For questions or comments on this closure, contact  Alarm Shop at 541-737-6626.

Construction and construction related activities will be taking place at Dixon Recreation Center main entrance sidewalk on 26th Street  (see map)  April 18 – May 9, 2024 for evacuation and equipment movement.  The entrance will remain open, but fencing will be placed by OSU contractors to separate Dixon Rec patrons from construction equipment.  Construction noise may be noticed during normal business hours.

For questions or comments on this closure, contact Les Walton  at 541-737-8812.