This is an update on a water pipeline and road improvement project led by the city of Corvallis. Work is expected to continue through September 2025. Typical work hours for this project will be Monday through Friday, 7 a.m. to 5 p.m.  To sign up for updates on this project from the city, visit https://www.corvallisoregon.gov/subscribe and select the Transportation Project – Western Blvd, 35th St, 11th St subscription list.

Impacts for the week of April 14th – 18th

  • Traffic on Western Blvd. between West Hills Rd. and SW 35th St. will be limited to a single lane and controlled by flaggers. All lanes will reopen at the end of each workday.
  • The signal at SW 35th St. and Western Blvd. will be shut down and become a four-way stop. Flaggers will be present to direct traffic. The intersection will remain open in all directions. The signal will be restored at the end of each workday.
  • Bike lanes will be closed and bikes will ride with traffic.
  • The sidewalk on the north side of Western Blvd. will be closed. Pedestrians traveling on Western Blvd. between 30th and 35th St. may detour around the area using the south sidewalk.
  • Access to local driveways will be maintained and signage will be posted to keep the Western Building driveways clear while the intersection signal is shut down.
  • Temporary changes to CTS bus stops are possible. See https://www.corvallisoregon.gov/cts for city bus information.

Please note: a full closure of the SW 35th St./Western Blvd. intersection is scheduled to start on April 28th. Details regarding this closure will be available in the next update.

A map showing a lane closure and sidewalk closure on SW Western Blvd.

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing, building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

August 21st

  • Community Hall
  • Cordley Hall
  • Learning Innovation Center
  • Shepard Hall

August 22nd

  • CH2M Hill Alumni Center
  • LaSells Stewart Center
  • University Plaza

August 23rd

  • Crop Science Bldg.
  • Oak Creek Bldg.
  • Western Bldg.

August 24th

  • A.A Red Emmerson Advanced Wood Products Laboratory
  • Hinsdale Wave Research Lab
  • Radiation Center
  • Vet Research Lab

August 25th

  • James E Oldfield Animal Teaching Facility
  • Jefferson Street Building
  • Agricultural & Life Sciences Bldg.

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of the Campus Operations building project, the Western Building parking lot will be fully closed for paving. Paving work is scheduled to start on Thursday, April 15 through Sunday, April 18, 2021. If you are planning to come to the Western Building on these days, you will need to park in another parking lot. If you have fleet vehicles in the Western Building lot, they will need to be moved by end of day on Wednesday, April 14, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building parking lot area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building lot for grading and paving work. Partial lot closures are scheduled to start on Monday, April 5 through Friday, April 23, 2021. Half of the parking lot will remain open at all times. Please note, paving work is weather dependent and future updates to the schedule may follow this notice.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building lot area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building parking lot. The partial lot closures are scheduled to start on Monday, Feb. 8 through Friday, Feb. 12, 2021. The west half of the parking lot will be closed for storm line work from Monday, Feb. 8 through Wednesday, Feb. 10, 2021. The east half of the parking lot will be closed for storm line work from Thursday, Feb. 11 through Friday, Feb. 12, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.