Otis will be conducting routine elevator safety testing. Testing will take place in the buildings listed below and be completed between 7 am -5 pm. Each unit will be out of service for approximately 4 hours and signage will be posted on elevator doors and call buttons while testing is being conducted.

July 15th  

  • The Valley Library – Elevator #1

July 16th

  • The Valley Library – Elevator #2
  • The Valley Library – Elevator #4

July 17th

  • The Valley Library – Elevator #5
  • Wilkinson Hall

July 18th

  • Snell Hall- Main elevator
  • Pharmacy

July 19th  

  • Nash Hall
  • Milam Hall

July 20th  

  • Rogers Hall
  • Gleeson Hall

For questions or comments on this notice contact, Brandon Holden  at 541-737-8313.

This is an update to a previous notification.

The City of Corvallis and OSU are collaborating on a project to improve the pedestrian crossing at SW 35th St. and SW Campus Way. A pedestrian detour and preliminary work has already been established in this area. A full closure of the intersection is currently scheduled to start on Monday, July 29 through Friday, August 9. Please note that the closure schedule has been updated since the initial notification.

A map showing a road closure at the intersection of SW 35th St. and SW Campus Way.

An updated Campus Notification will be sent the week before this closure begins.

For questions or comments on this closure, contact OSU Project Manager Aaron Amoth at (541) 737-5064.