This year there is not a need for Facilities Services annual shutdown of the university’s steam system.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
This year there is not a need for Facilities Services annual shutdown of the university’s steam system.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
SW 30th St. will be closed in both directions between SW Washington Way and SW Campus Way on Friday, May 31 from 9 A.M. – 1 P.M. for pothole repairs. The east-west intersection at SW Jefferson Way will remain open during this closure.
Sidewalks on 30th St. will remain open.
Other possible impacts include noise, dust and mud near the work site.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators. Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing. Each generator will be refueled after testing.
Week of June 3rd
Week of June 10th
Week of June 17th
Week of June 24th
For questions or comments on this notice contact, Facilities Services at 541-737-2969.
This is an update to a previous notification.
As part of the Washington Way Improvement project, flaggers will be present to direct traffic at the intersection of SW 35th St. and SW Washington Way through Friday, May 31.
The east sidewalk on 35th St., on both the north and south sides of the intersection, will be closed. The east crosswalk at 35th St. and Washington Way will also be closed. Pedestrians may use the west sidewalk and north crosswalk on 35th St. as a detour. The multi-use path on the south side of Washington Way will remain open.
Other possible impacts include dust, mud and noise near the worksite.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.
Northwest Natural Gas will be performing utilities work at the intersection of SW 35th St. and SW Western Blvd. on Wednesday, May 29. The traffic signal at the intersection will be shut down from 9 A.M. to 4 P.M. Flaggers will be present to direct traffic.
Pedestrian access will be allowed when at all possible and signage will indicate any detours.
For questions or comments on this closure, contact Rob Heiken at (541) 766-6729, ext. 6436.
SW 30th St. will be closed in both directions between SW Washington Way and SW Campus Way on Tuesday, May 28 for pothole repairs. The east-west intersection at SW Jefferson Way will remain open during this closure.
Sidewalks on 30th St. will remain open.
Other possible impacts include noise, dust and mud near the work site.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
As part of the Washington Way Improvement project, flaggers will be present to direct traffic at the intersection of SW 35th St. and SW Washington Way on Friday, May 24.
The east sidewalk on 35th St., on both the north and south sides of the intersection, will be closed. The east crosswalk at 35th St. and Washington Way will also be closed. Pedestrians may use the west sidewalk and north crosswalk on 35th St. as a detour. The multi-use path on the south side of Washington Way will remain open.
Other possible impacts include dust, mud and noise near the worksite.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.
As part of the Kelley District Utility Plant project, SW Campus Way between SW 26th St. and SW Memorial Place will be closed starting Wednesday, May 29 through Monday, June 10. The closure is necessary to allow for crane activity related to the project. Unlike recent, intermittent closures related to the project, this will be a continuous closure of Campus Way.
The Kelley Engineering Center south entrance will also be closed.
The north sidewalk and both bicycle lanes in this section of Campus Way will be closed during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
This is an update to a previous notification.
The crane work on SW Memorial Place near Kelley Engineering Center has been completed and the street, parking spaces and sidewalk will reopen on Tuesday, May 21 at 4 P.M.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
The City of Corvallis has informed OSU that the buildings listed above will be without water while they work to make emergency repairs on a water main break that occurred overnight. This shutdown will affect fire sprinklers, restrooms, labs and drinking fountains throughout these buildings. Restrooms will be available in adjacent buildings. An update will be sent out when more information becomes available.