As part of the Withycombe Hall Renovation project, SW Campus Way will be closed between SW 30th St. and the Agricultural & Life Sciences Building from Monday, December 11 through Saturday, January 6. Emergency access and pre-arranged access to the East Greenhouses will be maintained during this closure.

The north sidewalk in this section of Campus Way will be closed. The south sidewalk and the south side of the brick walkway near ALS will remain open for pedestrians.

The map shows a street and sidewalk closure on SW Campus Way between SW 30th St. and the Agriculture and Life Sciences Building. The north sidewalk in the construction zone is marked as closed. A pedestrian detour is marked along the south sidewalk and the south side of the brick walkway near the Agriculture and Life Sciences Building.

For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.

Print Friendly, PDF & Email

Discover more from OSU Corvallis Campus Closures, Shutdowns and Detours

Subscribe to get the latest posts sent to your email.

Comments are closed.