Nash AHU59 (air handler units) will be shut down to replace failed VFD drives for fan motors,  AHU59 will be shutdown from 6am September 19th to 4pm September 20th. This will affect air flow to the labs on all floors and there will be very limited heating or cooling during this time. Exhaust fans will continue to run but fume hoods should not be used during this time and fume hood sashes should remain closed.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences September 19, 2023 7:30 am – 12:00 pm. Building occupants may notice slight pressure & air flow changes throughout the building.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

Update – The contractor has provided an update that repairs to the chiller should be completed in 4 to 5 weeks

Emergency Shutdown Notice – The Kerr Administration Building chiller was damaged due to the power outage that occurred on 8/31. This will affect cooling for the entire building. Facilities Services is currently working to source replacement parts. A restoral date is unknown at this time, but updates will be sent out when they are available.

For questions or comments on this notice contact, Facilities Services  at 541-737-2969.