As part of the Magruder Hall Renovation and Addition, chiller 4 at Magruder Hall is scheduled to be shut down for wiring work (view map). The shutdown is scheduled to start on Thursday, Nov. 5 through Saturday, Nov. 7, 2020. The chiller will be off for a total of three days. The main panel will be turned off and a planned electrical shutdown for the building will occur for approximately two hours on Saturday, Nov. 7.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Magruder Hall area map

As part of the Nash Hall Elevator Project, a crane pick will be set up outside of Nash Hall (view map). This will require caution in the surrounding area and the contractor will provide caution tape around critical areas. Work is scheduled to occur on Monday, Nov. 2, 2020.

For questions or comments on this closure, contact OSU Infrastructure Project Manager Aaron Collett at 541-207-2780 or Ausland Group contractor Tom Jordan at 541-228-5197.

Nash Hall area map

All steam services will be shutdown to these buildings beginning Sunday, November 1st until the afternoon of Wednesday, November 4th.  This critical shutdown is necessary to repair a leaking steam line in the vault behind Johnson Hall and to replace failed pumps.  This will affect all steam services in these buildings including heating, autoclaves and hot water.  Building temperatures will be lower than normal during this time.

For questions or comments on this closure, contact Les Walton at 541-737-8812.

As part of the North District Utility Plant (NDUP) project, NW Orchard Avenue will be closed to complete utility work associated with the NDUP. Please view the map for erinoutdoors closure area information. The road closure and utility work started on Monday, Oct. 26, 2020. The closure has been extended through Monday, Nov. 30, 2020.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

NW Orchard Avenue closure area map

As part of the Research Way Lab Building Renovation Project, a water source heat pump above the ceiling at lobby 2000 will be replaced. Work is scheduled to begin on Friday Oct. 23, 2020 through Wednesday, Oct. 28, 2020. Work will take place on the second floor of the building.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302 or Construction Manager Amy Keene at 541-214-1038.

Map of work area

For work related to the Buxton Hall roof replacement, there will be a crane at Buxton Hall offloading material from the roof. Both lanes of SW Jefferson Way will be closed at the corner of SW Weatherford Place. The south sidewalk will also be closed to pedestrian traffic at this location. SW Weatherford Place between SW Jefferson Way and SW Intramural Lane will also be closed. The closure is scheduled for Friday, Oct. 16, 2020, from 9 a.m. to 5 p.m.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Buxton Hall and SW Jefferson Way area map

Notice:  Water Shutdown Crop Science Building  

Effective Date(s): October 15th 6:00am – 9:00 am

The building water for Crop Science will be shutdown to repairs, October 15th, 2020 from 6:00 am. 9:00 am.  This will affect all potable water, building wide.  Restrooms will be temporarily out of order and signage will be in place. 

For questions or comments on this closure, contact Facilities Services at 541-737-2969.

Effective Date(s): October 13th 2020 7:00 am -12:00 pm   

In order to perform emergency steam line repairs, steam will be turned off to the South wing of Magruder Hall tomorrow, 10/13 from 7am to 12pm.  This will affect domestic hot water and heating water for this portion of the building.  Water temperature and some air temperature may be lower than normal. 

For questions or comments on this closure contact Les Walton at 541-737-8812.