The fire sprinklers in Research Way Labs Building will be shut down June 9, 2021 from 9:00 am to 3:00 pm while repairs are performed to the backflow prevention system.  Pull stations and smoke detectors will still be operational and so will horns/pulls.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

The fire sprinklers and water in Rogers Hall will be shut down June 10, 2021 from 9:00 am to 3:00 pm while repairs are performed to the backflow prevention system. This will affect domestic water building wide, restrooms will be closed and signage posted.  Pull stations and smoke detectors will still be operational and so will horns/pulls.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

The fire sprinklers and water in Gilbert Addition will be shut down June 8, 2021 from 9:00 am to 3:00 pm while repairs are performed to the backflow prevention system. This will affect domestic water building wide, restrooms will be closed and signage posted. Pull stations and smoke detectors will still be operational and so will horns/pulls.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

Due to a failed chiller component, the Kerr Administration Bldg. will be without cooling for the next several days while replacement parts are on order. This may cause higher than normal temperature levels building-wide. An additional notice will be sent out when repairs are complete and cooling is restored.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

For work related to Pacific Power system upgrades, the multi-use path along SW Washington Way will be temporarily sectioned off between 30th Street and 35th Street for electrical work being performed by Pacific Power. A detour will be in place. Work is extended through Monday, May 24, 2021.

For questions or comments on this work, contact Torre Oberg, project manager with Magnum Power, at 360-703-7432, or OSU Infrastructure Project Manager Aaron Collett at 541-207-2780. Magnum Power is the contractor working with Pacific Power.

SW Washington Way area map

As part of the Research Way Lab Building Renovation Project, workers will be pressure testing the coil for the cooling tower outside north of the building. This affects heat and cooling for the building. Temperatures are forecasted to be cool on the day of the scheduled work to avoid allowing the building to get too warm.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Research Way Lab Building area map

As part of the Nash Hall Elevator project, work is scheduled to modify four sprinkler heads. This requires a temporary shutdown of the water to the fire suppression system as well as temporary disabling of associated alarms. Work is scheduled to take place on the morning of Monday, April 26, 2021. This work does not impact other building utilities.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map